[Federal Register: August 14, 2002 (Volume 67, Number 157)]
[Notices]
[Page 52981-52982]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr14au02-102]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene, Protests, and Comments
August 8, 2002.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12262-000.
c. Date filed: June 21, 2002.
d. Applicant: Universal Electric Power Corp.
e. Name of Project: Shenango Dam Project.
f. Location: On the Shenango River in Mercer County, Pennsylvania.
The existing Shenango Dam is administered by the U.S. Army Corps of
Engineers.
g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r).
h. Applicant Contact: Mr. Raymond Helter, Universal Electric Power
Corp., 1145 Highbrook Street, Akron, OH 44301, (330) 535-7115, e-mail
uep@neo.rr.com.
i. FERC Contact: Robert Bell, (202) 219-2806.
j. Deadline for filing motions to intervene, protests and comments:
60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, motions to
intervene, and protests may be electronically filed via the Internet in
lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on
the Commission's Web site at http://www.ferc.fed.us/efi/doorbell.htm.
Please include the project number (P-12262-000) on any comments or
motions filed.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project utilizing the
existing U.S. Army Corps of Engineer's Shenango Dam and reservoir would
consist of: (1) A penstock and discharge works; (2) a powerhouse on the
tailrace side of the dam with a total installed capacity of 1,510 kW;
(3) a transmission line; and (4) other appurtenances.
Applicant estimates that the average annual generation would be
5,800 MWh and would be sold to a local utility.
l. A copy of the application is available for inspection and
reproduction at the Commission's Public Reference Room, located at 888
First Street, NE., Room 2A, Washington, DC 20426, or by calling (202)
208-1371. The application may be viewed on http://www.ferc.gov using
the ``FERRIS'' link. Enter the docket number excluding the last three
digits in the docket number to access the document. For assistance call
(202) 502-8222 or for TTY, (202) 208-1659. A copy is also available for
inspection and reproduction at the address in item h above.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link.
m. Preliminary Permit--Anyone desiring to file a competing
application for preliminary permit for a proposed project must submit
the competing application itself, or a notice of intent to file such an
application, to the Commission on or before the specified comment date
for the particular application (see 18 CFR 4.36). Submission of a
timely notice of intent allows an interested person to file the
competing preliminary permit application no later than 30 days after
the specified comment date for the particular application. A competing
preliminary permit application must conform with 18 CFR 4.30(b) and
4.36.
n. Preliminary Permit--Any qualified development applicant desiring
to file a competing development application must submit to the
Commission, on or before a specified comment date for the particular
application, either a competing development application or a notice of
intent to file such an application. Submission of a timely notice of
intent to file a development application allows an interested person to
file the competing application no later than 120 days after the
specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
o. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
p. Proposed Scope of Studies under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation
[[Page 52982]]
of a development application to construct and operate the project.
q. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
r. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. An additional copy must be sent to Director,
Division of Hydropower Administration and Compliance, Federal Energy
Regulatory Commission, at the above-mentioned address. A copy of any
notice of intent, competing application or motion to intervene must
also be served upon each representative of the Applicant specified in
the particular application.
s. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Linwood A. Watson, Jr.,
Deputy Secretary.
[FR Doc. 02-20541 Filed 8-13-02; 8:45 am]