FOOTNOTE 1 — PERFORMANCE OBJECTIVE RESOURCES TABLE:
1
In the FY 2004 PAR, the 2002-2004 amounts for the mission support objective
were distributed among the four objectives. In this PAR, the 2002-2004
mission support levels were separated out resulting in lower 2002-2004
levels than as reported in the FY 2004 PAR for the other four objectives.
|
Back to Text
|