[Federal Register: October 27, 2006 (Volume 71, Number 208)]
[Notices]               
[Page 63007]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr27oc06-52]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6680-5]

 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.


Weekly receipt of Environmental Impact Statements
Filed 10/16/2006 Through 10/20/2006
Pursuant to 40 CFR 1506.9.

EIS No. 20060435, Final EIS, COE, AZ, Rio Salado Oeste Project, 
Ecosystem Restoration along the Salt River, City of Phoenix, Maricopa 
County, AZ, Wait Period Ends: 11/27/2006, Contact: Scott K. Estergard 
602-640-2003.
EIS No. 20060436, Draft Supplement, FHW, IN, US-31 Kokomo Corridor 
Project, Updated Information on Alternative J, Transportation 
Improvement between IN-26 and U.S. 35 Northern Junction, City of Kokomo 
and Center Township, Howard and Tipton Counties, IN, Comment Period 
Ends: 12/11/2006, Contact: Larry Heil 317-226-7480.
EIS No. 20060437, Draft EIS, NRS, WV, Dunloup Creek Watershed Plan, 
Voluntary Floodplain Buyout, Implementation, West Virginia Third 
Congressional District, Fayette and Raleigh Counties, WV, Comment 
Period Ends: 12/11/2006, Contact: Ronald Hilliard 304-284-7540.
EIS No. 20060438, Draft EIS, VAD/DON, CA, Fort Rosecrans National 
Cemetery Annex, Construction and Operation, Located at Marine Corps Air 
Station (MCAS) Miramar, Point Loma, San Diego County, CA, Comment 
Period Ends: 12/11/2006, Contact: Hiphil Clemente 619-532-3781.
EIS No. 20060439, Final Supplement, AFS, CA, Rock Creek Recreational 
Trails Project, Updated Information on Habitat Status and Population 
Trend for the Pacific Deer Herd, Implementation, Eldorado National 
Forest, Eldorado County, CA, Wait Period Ends: 11/27/2006, Contact: 
Laura Hierholzer 530-642-5187.
EIS No. 20060440, Draft EIS, GSA, VA, Federal Bureau of Investigation 
(FBI) Central Records Complex, Site Selection and Construction, 
Winchester, Frederick County, VA, Comment Period Ends: 12/11/2006, 
Contact: Katrina Scarpato 215-446-4651.
EIS No. 20060441, Final EIS, CGD, MA, Northeast Gateway Deepwater Port 
License Application to Import Liquefied Natural Gas (LNG) (USCG-2005-
22219), Massachusetts Bay, City of Gloucester, MA, Wait Period Ends: 
11/27/2006, Contact: Roddy Bachman 202-372-1451.
EIS No. 20060442, Final EIS, BLM, ID, Coeur d'Alene Resource Management 
Plan, Implementation, Benewah, Bonner, Boundary, Kootenai and Shoshone 
Counties, ID, Wait Period Ends: 11/27/2006, Contact: Scott Pavey 208-
769-5059.

Amended Notices

EIS No. 20060348, Draft EIS, NPS, MN, Disposition of Bureau of Mines 
Property, Twin Cities Research Center Main Campus, Implementation, 
Hennepin County, MN, Comment Period Ends: 11/24/2006, Contact: Kim M. 
Berns 651-290-3030-x244. Revision of FR Notice Published 08/18/2006: 
Extend Comment Period from 10/16/2006 to 11/24/2006.
EIS No. 20060360, Draft EIS, AFS, WA, Gifford-Pinchot National Forest 
and Columbia River Gorge National Scenic Area (Washington Portion) 
Site-Specific Invasive Plant Treatment Project, Implementation, 
Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA, Comment Period 
Ends: 11/22/2006, Contact: Carol A. Chandler 541-360-5100. Revision of 
FR Notice Published 09/01/2006: Extending Comment Period from 10/16/
2006 to 11/22/2006.
EIS No. 20060376, Draft EIS, FHW, AK, Knik Arm Crossing Project, To 
Provide Improved Access between the Municipality of Anchorage and 
Matanuska-Susitna Borough, AK, Comment Period Ends: 11/17/2006, 
Contact: Ms. Edrie Vinson 907-586-7464. Revision of FR Notice Published 
09/15/2006: Extend Comment from 10/30/2006 to 11/17/2006.

    Dated: October 24, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-18018 Filed 10-26-06; 8:45 am]

BILLING CODE 6560-50-P