[Federal Register: December 29, 2006 (Volume 71, Number 250)]
[Notices]               
[Page 78427-78428]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr29de06-68]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6682-5]

 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/. 

Weekly receipt of Environmental Impact Statements filed 12/18/2006 
through 12/22/2006 pursuant to 40 CFR 1506.9.

EIS No. 20060526, Draft EIS, AFS, NM, Canadian River Tamarisk Control, 
Proposes to Control the Nonnative Invasive Species Tamarisk (also Known 
as salt cedar) Cibola National Forest, Canadian River, Harding and Mora 
Counties, New Mexico, Comment Period Ends: 02/12/2007, Contact: Keith 
Baker 505-346-3820
EIS No. 20060527, Final EIS, AFS, WI, Long Rail Vegetation and 
Transportation Management Project, Implementation, Eagle River-Florence 
Ranger District, Chequamegon-Nicolet National Forest, Florence and 
Forest Counties, WI, Wait Period Ends: 01/29/2007, Contact: Christine 
Brunner 714-479-2827 Ext 21
EIS No. 20060528, Final EIS, AFS, ID, Emerald Creek Garnet Area, To 
Provide a Public Recreational Area for Collecting Garnet Gemstone, U.S. 
Army COE Section 404 Permit, Idaho Panhandle National Forest, St. Joe 
Ranger District, Latah County, ID, Wait Period Ends: 01/29/2007, 
Contact: Tracy Gravelle 208-245-4517
EIS No. 20060529, Final EIS, AFS, OR, Maury Mountains Allotment 
Management Plan, To Implement or Eliminate Livestock Grazing in Six 
Allotments in the Maury Mountains of the Ochoco National Forest, 
Prineville, OR, Wait Period Ends: 01/29/2007, Contact: Kevin Keown 541-
416-6484
EIS No. 20060530, Final EIS, USA, MD, U.S. Army Medical Research 
Institute of Infectious Diseases (USAMRIID), Construction and Operation 
of New USAMRIID Facilities and Decommissioning and Demolition and/or 
Re-use of Existing USAMRIID Facilities, Fort Detrick, MD, Wait Period 
Ends: 01/29/2007, Contact: Dave Hand 410-962-8154

[[Page 78428]]

EIS No. 20060531, Final EIS, FRC, OR, Clackamas River Hydroelectric 
Project, Application for Relicensing of a Existing 173 megawatt(MS) 
Project, (FERC No. 2195-011) Clackamas River Basin, Clackamas County, 
OR, Wait Period Ends: 01/29/2007 Contact: Andy Black 1-866-208-3372
EIS No. 20060532, Final EIS, BIA, AK, Cordova Oil Spill Response 
Facility, Construct an Oil Spill Response Facility at Shepard Point, 
NPDES Permit and U.S. Army COE Section 10 and 404 Permits, Cordova, AK, 
Wait Period Ends: 01/29/2007, Contact: Kristin K'eit 907-586-7423
EIS No. 20060533, Final EIS, FHW, VA, I-73 Location Study, between 
Roanoke and the North Carolina State Line Commonwealth of Virginia, 
Construction and Operation, Cities of Roanoke and Martinsville, 
Counties of Bedford, Botetourt, Franklin, Henry, and Roanoke, VA, Wait 
Period Ends: 01/29/2007, Contact: Edward Sundra 804-775-3338
EIS No. 20060534, Final EIS, NOA, 00, Gulf of Mexico Red Snapper Total 
Allowable Catch and Reduce Bycatch in the Gulf of Mexico Directed and 
Shrimp Trawl Fisheries, To Evaluate Alternatives, Gulf of Mexico, Wait 
Period Ends: 01/29/2007, Contact: Roy E. Crabtree 727-824-5301
EIS No. 20060535, Draft EIS, FHW, ID, U.S.-95 Garwood to Sagle (from 
MP-438.4 to MP 469.75) Transportation Improvements to Present and 
Future Traffic Demand, Funding, NPDES Permit and U.S. Army COE Section 
404 Permit, Kootenai and Bonner Counties, ID, Comment Period Ends: 02/
15/2007, Contact: Paul Ziman 208-334-1843
EIS No. 20060536, Final EIS, FTA, TX, North Corridor Fixed Guideway 
Project, Propose Transit Improvements from University of Houston (UH)-
Downtown Station to Northline Mall, Harris County, TX, Wait Period 
Ends: 01/29/2007, Contact: John Sweek 817-978-0550
EIS No. 20060537, Final EIS, COE, CA, American River Watershed, Lower 
American River Common Features Mayhew Levee Project, Reconstruction, 
Sacramento County, CA , Wait Period Ends: 01/29/2007, Contact: 
Elizabeth Holland 916-557-6712
EIS No. 20060538, Final EIS, FRC, SC, Casotte Landing Liquefied Natural 
Gas (LNG) Import and Interstate Natural Gas Transmission Facilities, 
Construction and Operation, U.S. Army COE Section 404 Permit, (FERC/
EIS-0193D), near the City of Pascagoula, Jackson County, MS, Wait 
Period Ends: 01/29/2007, Contact: Andy Black 1-866-208-3372

Amended Notices

EIS No. 20060489, Final EIS, COE, 00, Lock and Dam 3 Mississippi River 
Navigation Safety and Embankments, To Reduce Related Navigation Safety 
and Embankment Problems, Upper Mississippi River, Goodhue County, MN 
and Pierce County, WI, Wait Period Ends: 01/12/2007, Contact: Daniel 
Wilcox 651-290-5276 Revision of FR Notice Published 12/01/2006: 
Correction to Wait Period from 01/02/2007 to 01/12/2007

    Dated: December 26, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
 [FR Doc. E6-22411 Filed 12-28-06; 8:45 am]

BILLING CODE 6560-50-P