[Federal Register: November 17, 2004 (Volume 69, Number 221)]
[Notices]               
[Page 67334]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr17no04-49]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP05-15-000, CP05-16-000, and CP05-17-000]

 
Caledonia Energy Partners, Notice of Application

November 8, 2004.
    Take notice that on October 26, 2004, Caledonia Energy Partners, 
L.L.C. (Caledonia), 3700 Forums Drive, Suite 104, Flower Mound, Texas, 
75028, filed with the Federal Energy Regulatory Commission an 
application pursuant to section 7 of the Natural Gas Act (NGA) to 
construct and operate an underground natural gas storage facility in 
Lowndes and Monroe Counties, Mississippi. Specifically Caledonia 
proposes to convert a depleted natural gas reservoir, the Caledonia 
Field, into a high deliverability multi-cycle gas storage field capable 
of storing 11.7 Bcf of working gas with a maximum withdrawal capacity 
of 330,000 MMcf per day. The initial interconnect with Tennessee Gas 
Pipeline Company (Tennessee) will be at its Zone-1 500 Leg Mainline. 
Caledonia seeks to charge market based rates for its services which 
will include firm and interruptible storage services, as well as an 
interruptible loan service. The project will include the construction 
of eight horizontal injection/withdrawal wells, three 3550 horsepower 
compressors and approximately 1.98 miles of pipe to connect the wells, 
and to connect the compression facility to the Tennessee interconnect, 
all as more fully set forth in the application which is on file with 
the Commission and open to public inspection. This filing may be also 
viewed on the Web at http://www.ferc.gov using the ``eLibrary'' link. 

Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, call (202) 502-
8659 or TTY, (202) 208-3676.
    Any questions regarding this application should be directed to Jim 
Goetz, Caledonia Energy Partners, L.L.C., 3700 Forums Drive, Suite 104, 
Flower Mound, Texas, 75028, at (972) 691-3332 or fax (972) 874-8743.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under the ``e-Filing'' 
link.

    Comment Date: November 29, 2004.
Magalie R. Salas,
Secretary.
 [FR Doc. E4-3189 Filed 11-16-04; 8:45 am]

BILLING CODE 6717-01-P