[Federal Register: March 19, 2004 (Volume 69, Number 54)]
[Notices]               
[Page 13027-13028]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19mr04-41]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER97-1397-010, et al.]

 
South Jersey Energy Company, et al.; Electric Rate and Corporate 
Filings

March 11, 2004.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. South Jersey Energy Company

[Docket No. ER97-1397-010]

    Take notice that on March 8, 2004, South Jersey Energy Company 
(SJE) tendered for filing an updated market analysis in compliance with 
the Commission's order, issued February 28, 1997, in Docket No. ER97-
1397-000.
    Comment Date: March 29, 2004.

2. Calpine Oneta Power, L.P.

[Docket No. ER04-279-001]

    Take notice that on March 8, 2004, Calpine Oneta Power, L.P. 
(Oneta) tendered for filing, under section 205 of the Federal Power Act 
and in compliance with the Order issued February 6, 2004, in Docket No. 
ER04-0279-000, 106 FERC ]61,107 (2004), a revised rate schedule for 
Emergency Redispatch Service.
    Comment Date: March 29, 2004.

3. Exelon New Boston, LLC

[Docket No. ER04-344-001]

    Take notice that on March 8, 2004, Exelon New Boston, LLC (Exelon 
New Boston) tendered for filing the Second Amended Reliability Must Run 
Agreement by and among Exelon New Boston LLC, Exelon New England 
Holdings, LLC and ISO New England, Inc., Exelon New Boston Second 
Revised Rate Schedule FERC No. 3, to comply with the Commission's 
February 27, 2004, Order in Docket No. ER04-344-000.
    Comment Date: March 29, 2004.

4. Duke Energy Corporation

[Docket No. ER04-365-001]

    Take notice that on March 9, 2004, Duke Energy Corporation (Duke), 
submitted for filing its Interconnection Agreement with North Carolina 
Electric Membership Corporation designated as Second Revised FERC 
Electric Rate Schedule No. 273 in conformance with Order No. 614, 
Designation of Electric Rate Schedule Sheets, FERC Stats. & Regs. 
Preambles ]31,096 (2000) filed in compliance with the Commission Order 
issued February 26, 2004, in Docket No. ER04-365-000.
    Comment Date: March 30, 2004.

5. California Independent System Operator Corporation

[Docket No ER04-370-002]

    Take notice that, on March 9, 2004, the California Independent 
System Operator Corporation (ISO) submitted a revised informational 
filing regarding the ISO's transmission Access Charge and Wheeling 
rates for the East Central Area (TAC Area), effective January 1, 2004. 
ISO states that these changes are necessary to reflect modifications to 
the Transmission Revenue Balancing Account Adjustments of the Cities of 
Anaheim, Azusa, Banning and Riverside, California.
    ISO states that it has served copies of the filing on the Public 
Utilities Commission of the State of California, the California Energy 
Commission, the California Electricity Oversight Board, the 
Participating Transmission Owners, and upon all parties with effective 
Scheduling Coordinator Service Agreements under the ISO Tariff. In 
addition, the ISO is posting the filing on its Web site.
    Comment Date: March 29, 2004.

6. Indeck-Oswego Limited Partnership

[Docket No. ER04-493-001]

    Take notice that on March 8, 2004, Indeck-Oswego Limited 
Partnership (Indeck-Oswego) tendered for filing an amendment to its 
January 29, 2004, filing in Docket No. ER04-493-000.
    Comment Date: March 29, 2004.

7. Portland General Electric Company

[Docket No. ER04-604-001]

    Take notice that on March 5, 2004, Portland General Electric 
Company (PGE) tendered for filing an amendment to their March 1, 2004, 
filing under PGE's FERC Electric Tariff, Original Volume No. 12. PGE 
states that the revisions are intended to bring their Form of Umbrella 
Service Agreement into conformance with current business practices.
    PGE states that a copy of the filing was served upon the Oregon 
Public Utility Commission.
    Comment Date: March 26, 2004.

8. American Electric Power Service Corporation

[Docket No. ER04-624-000]

    Take notice that on March 8, 2004, American Electric Power Service 
Corporation (AEPSC) submitted for filing four transmission 
interconnection agreements on behalf of its AEP Texas Central Company 
and AEP Texas North Company affiliates. AEPSC states that these 
agreements with Rio Grande Electric Cooperative, Inc., (RGEC) Texas-New 
Mexico Power Company (TNMP) and the City of Brady, Texas provide for 
the continued interconnection of the parties systems at all of their 
existing points of interconnection and that no new points of 
interconnection are included in these agreements. AEPSC seeks an 
effective date of February 23, 2004, for the agreements with RGEC, 
January 9, 2004, for the agreement with TNMP and January 1, 2003, for 
the agreement with the City.
    AEPSC states that it served copies of the filing on RGEC, TNMP, the 
City and the Public Utility Commission of Texas.
    Comment Date: March 29, 2004.

9. Southern California Edison Company

[Docket No. ER04-626-000]

    Take notice that on March 9, 2004, Southern California Edison 
Company (SCE) tendered for filing a Letter Agreement between SCE and 
the Blythe Energy, LLC (Blythe Energy). SCE states that the purpose of 
the Letter Agreement is to provide an interim arrangement pursuant to 
which SCE will commence the required biological and cultural studies 
and certain other tasks required

[[Page 13028]]

to prepare an application for a Certificate of Public Convenience and 
Necessity from the California Public Utilities Commission in 
anticipation of constructing, at Blythe Energy's request a 230 kV 
transmission line from Western Area Power Administration's Buck Blvd. 
Substation to a new 500-230-161 kV Substation (Midpoint Substation) to 
be located adjacent to or under SCE's existing Palo Verde-Devers 
transmission line.
    SCE states that copies of this filing were served upon the Public 
Utilities Commission of the State of California and Blythe Energy.
    Comment Date: March 30, 2004.

10. MidAmerican Energy Company

[Docket No. ER04-627-000]

    Take notice that on March 9, 2004, MidAmerican Energy Company 
(MidAmerican), tendered for filing with the Commission a Transmission 
Operating Agreement between MidAmerican Energy Company and Nebraska 
Public Power District, which incorporates Amendment No. 2 to the 
Agreement dated December 31, 2003. MidAmerican requests an effective 
date of December 31, 2003, for this Agreement, however MidAmerican 
states that the revisions will not be implemented until January 1, 
2005.
    MidAmerican states that it has served a copy of the filing on the 
Iowa Utilities Board, the Illinois Commerce Commission and the South 
Dakota Public Utilities Commission.
    Comment Date: March 30, 2004.

Standard Paragraph

    Any person desiring to intervene or to protest this filing should 
file with the Federal Energy Regulatory Commission, 888 First Street, 
NE., Washington, DC 20426, in accordance with rules 211 and 214 of the 
Commission's rules of practice and procedure (18 CFR 385.211 and 
385.214). Protests will be considered by the Commission in determining 
the appropriate action to be taken, but will not serve to make 
protestants parties to the proceeding. Any person wishing to become a 
party must file a motion to intervene. All such motions or protests 
should be filed on or before the comment date, and, to the extent 
applicable, must be served on the applicant and on any other person 
designated on the official service list. This filing is available for 
review at the Commission or may be viewed on the Commission's Web site 
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket 

number excluding the last three digits in the docket number filed to 
access the document. For assistance, call (202) 502-8222 or TTY, (202) 
502-8659. Protests and interventions may be filed electronically via 
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site under the ``e-Filing'' link. 
The Commission strongly encourages electronic filings.

Magalie R. Salas,
Secretary.
 [FR Doc. E4-634 Filed 3-18-04; 8:45 am]

BILLING CODE 6717-01-P