A.1 | Name of your facility: |
| DuPont Front Royal
|
A.2 | Name of your parent company: |
| E.I. Du Pont de Nemours and Company, Inc.
|
A.3 | Facility contact person for the Performance Track program: |
|   Name: | Mr. James J. Nicola |
|   Title: | Environmental Manager |
|   Phone: | (540) 622-1264 |
|   Fax: | (540) 622-1344 |
|   Email: | jim.j.nicola-1@usa.dupont.com |
A.4 | Facility location: |
|   Street Address: | 7961 Winchester Road |
|   Address Cont: | |
|   City: | Front Royal |
|   State: | VA |
|   Zip Code: | 22630 |
| Mailing address (if different from above): |
|   Mailing Address: | |
|   Address Cont: | |
|   City: | |
|   State: | |
|   Zip Code: | |
A.5 | Facility's website address (if any): |
| http://virginia.dupont.com |
A.6 | Number of employees (full-time equivalents) who currently work in the facility: |
| 100-499 |
A.7 | North American Industrial Classification System (NAICS) Code(s) that is(are) used to classify business at the facility: |
| 32551  325211       |
A.8 | In your application and, perhaps, in previous annual performance reports, you described what your facility does or makes. Have there been any (additional) changes to your facility's list of products and/or activities? If yes, please list them here: |
| No Changes |
|
|
A.9 | Have the environmental requirements applicable to your facility changed during this reporting period? If yes, please describe these changes here. |
| No Changes |
| |
B.1.d | (Optional) If you would like to describe any other audits or inspections that were conducted at your facility, please do so here.
| |
|
| |
B.1.e | Briefly summarize corrective actions taken and other improvements made as a result of your EMS assessments and compliance audits.
| |
|
Minor upgrades to Procedures i.e. updating procedures to reflect ISO 14001/2004 upgrade.
| |
B.1.f | Has your facility corrected all instances of potential non-compliance and EMS non-conformance identified during your audits and other assessments? | |
| No such instances identified
| |
|
| |
B.1.g | When was the last Senior Management review of your EMS completed? | |
| October  2005 | |
| Who was the senior manager present at the review? | |
| Name: Mr. Charles Enzinger | |
| Title: Plant Manager
| |
C.4.b | Briefly describe how you achieved improvements for this aspect or, if relevant, any circumstances that delayed progress. |
| By completing an one time project to improve insulation effectiveness and improving heating & cooling system for the peroxiode storage building in the Resin manufacturing area. Annual reductions are as follows: Heating 54% (338,078 btu's to 154,000 btu's) Cooling 55% ( 765,600 btu's to 342,000 btu's). In 2003 the btu's were determined by measured current used for the heating and cooling units. 2004 & 2005 usage is estimtated based on 2003 improvements.
|
C.4.c | Please list any other EPA voluntary programs to which you are also reporting these data (e.g. Energy Star, Project XL). |
| Virginia DEQ E-4 Certification |