image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout
US Department of Transportation Home Layout Image Home Button Site Index Button Issue Briefs Button FOIA Button Employment Button image used for layout
About the FRA
Safety
Freight Rail
Passenger Rail
Research & Development
Press Room
Legislation, Regulation, Litigation.
Civil Rights & Accessibility


DOT Site Search:

FRA-only 

The Federal Railroad Administration Passenger train traveling through New England, autumn
landscape.

Environmental Impact Statement

An Environmental Impact Report / Environmental Impact Statement (EIR/EIS) has been prepared for the LA Union Station Run-through Tracks Project proposed by the California Department of Transportation (Department).  The Department supports the Amtrak's San Diego-Los Angeles-San Luis Obisbo Surfliner rail services, which rely upon LA Union Station and would use the run-through tracks. For this project, the Department is both the project sponsor and the lead agency for purposes of the California Environmental Quality Act (CEQA) requirements, and FRA is the lead federal lead agency for NEPA compliance. The Department is also preparing a Program EIR/EIS with FRA for a 20-year improvement program along the existing Los Angeles to San Diego rail corridor. 

The EIR/EIS analyzes the potential environmental impacts of the construction of tracks that would allow trains to pass through LA Union Station by extending four of the existing stub-end tracks and connecting them back to the mainline.  The construction of the Run-Through Tracks project would reduce trip times for both the Surfliner and Metrolink commuter trains to and from Orange County and points south as well as increasing the capacity of LA Union Station.

The Notice of Availability for the Draft EIR/EIS was published by US EPA in the Federal Register on September 10, 2004.  A public hearing was held on October 13, 2004.  The comment period closed October 25, 2004.  The Final EIR/EIS was released in November 2005. 

Download the Final EIR/EIS Executive Summary  (1.68mb/pdf)

layout image

About Us | Website Polices | Plug-ins | Privacy Policy | Site Index | Common Questions | Contact Us | Home | OIG Hotline


Federal Railroad Administration, U.S. Department of Transportation, 1200 New Jersey Avenue, SE, Washington, DC 20590