[Federal Register: September 21, 2001 (Volume 66, Number 184)]
[Notices]
[Page 48670-48671]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr21se01-63]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
(ER-FRL-6621-8)
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or www.epa.gov/ocea/ofa.
Weekly receipt of Environmental Impact Statements
Filed September 3, 2001 Through September 7, 2001
Pursuant to 40 CFR 1506.9.
Because of our nation's tragedy, the Environmental Protection
Agency Notice of Availability of Environmental Impact Statements for
the week of September 3 through September 7, 2001, which should have
appeared in the Federal Register on September 14, 2001, is being
published in the September 21, 2001 Federal Register. All Comment and
Wait Periods for EISs filed during the week of September 3 through
[[Page 48671]]
September 7 are calculated from 09/14/2001, unless otherwise indicated.
EIS No. 010337, FINAL EIS, AFS, ID, Spruce Moose and Moose Lake Right-
of-Way Analysis Area, Implementation, Timber Harvesting, Road
Construction, Reforestation and Watershed Restoration, Clearwater
National Forest, Lochsa Ranger District, Idaho County, ID , Wait Period
Ends: October 09, 2001, Contact: Cynthia A. Lane (208) 926-4275. This
FEIS should have appeared in the Federal Register on 09/07/2001. The
30-Day Wait Period is Calculated from 09/07/2001.
EIS No. 010338, FINAL EIS, FHW, TX, Tyler Loop 49 West, Construction
from the TX-155 Highway to I-20 Highway, Funding, NPDES and COE Section
404 Permits, Smith County, TX , Wait Period Ends: October 15, 2001,
Contact: Paul Clutts (512) 536-5968.
EIS No. 010339, FINAL EIS, AFS, MT, Asarco Rock Creek Copper and Silver
Mining Construction and Operation Project, Plan of Operations Approval,
Special Use Permit(s), Road Use Permit, Mineral Material Permit, Timber
Sale Contract and COE Section 404 Permit Issuance, Kootenai National
Forest, Sanders County, MT, Wait Period Ends: October 15, 2001,
Contact: John McKay (406) 293-6211. This document is available on the
Internet at: DEQ: http://www.deq.state.mt.us/eis.asp and KNF: http://
www.fs.fed.us/r1/kootenai.
EIS No. 010340, FINAL EIS, NPS, OK, Washita Battlefield National
Historic Site, General Management Plan, Implementation, Roger Mill
County, OK, Wait Period Ends: October 15, 2001, Contact: Sarah
Craighead (580) 497-2742.
EIS No. 010341, DRAFT EIS, AFS, OR, Shore 'Nuf Timber Sale, a proposal
for Harvesting Timber on the Detroit Ranger District, Willamette
National Forest, Linn and Marion Counties, OR, Comment Period Ends:
October 29, 2001, Contact: Jim Romero (503) 854-4212.
EIS No. 010342, FINAL EIS, BLM, NV, Reno Clay Plant Project, Construct
and Operate an Open-Pit Clay Mine and Ore Processing Facility, Plan-of-
Operations, Oil-Dri Corporation of Nevada, Hungry Valley, Washoe
County, NV, Wait Period Ends: October 15, 2001, Contact: Terri Knutson
(775) 885-6156. This document is available on the Internet at:
www.nv.blm.gov/carson.
EIS No. 010343, Final Supplemental, FHW, IL, FAP Route 340
Transportation Project, Construction from I-55 to I-80, Funding, US
Coast Guard Permit and COE Section 404 Permit, Cook, Dupage and Will
Counties, IL, Wait Period Ends: October 15, 2001, Contact: Norman R.
Stoner (217) 492-4640.
EIS No. 010344, Final EIS, AFS, AK, Woodpecker Project Area, Timber
Harvesting, Dispered Recreation Opportunities and Watershed
Improvements, Implementation, Tongass National Forest, Petersburg
Ranger District, Mitkof Islands, Petersburg, AK, Wait Period Ends:
October 15, 2001, Contact: Cynthia Sever (907) 772-3871. This document
is available on the Internet at: www.fs.fed.us/r10/Tongass.
EIS No. 010345, Final Supplemental, COE, NC, Manteo (Shallowbay) Bay
Project, Enlarging andDeepening Basin at Wanchese, Dare County, NC,Wait
Period Ends: October 22, 2001, Contact:Glenda Ashford (404) 562-5222.
EIS No. 010346, Draft Supplemental, COE, CA, American River Watershed
Long-Term Study, UpdatedInformation, To Provide Flood Damage Reduction
and Ecosystem Restoration, between Folsom Dam and the Sacramento River,
Sacramento, Placer andSutter Counties, CA, Comment Period Ends: October
29, 2001,Contact: Veronica Petrovsky (916) 557-7245.
EIS No. 010347, Draft EIS, COE, Programmatic EISNationwide Permits
Procedures Review and Examination,US Army Corps of Engineers Section 10
and 404 Permit Issuance,Comment Period Ends: October 29, 2001,Contact:
Dr. Bob Brumbaugh (703) 428-7069.
Dated: September 18, 2001.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 01-23643 Filed 9-20-01; 8:45 am]