[Federal Register: August 16, 2001 (Volume 66, Number 159)]
[Rules and Regulations]
[Page 42956-42957]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr16au01-10]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[FRL-7034-3]
Notice of Prevention of Significant Deterioration Final
Determination for Three Mountain Power, LLC, Burney, CA
AGENCY: Environmental Protection Agency.
ACTION: Notice of final action.
-----------------------------------------------------------------------
SUMMARY: The purpose of this document is to announce that, on May 30,
2001, the U.S. Environmental Protection Agency (EPA) Environmental
Appeals Board (``Board'') dismissed the petition for review filed by
the Burney Resources Group of a permit issued to Three Mountain Power,
LLC (``TMP'') by the Shasta County Air Quality Management District
(``Shasta'' or ``District'') pursuant to the Prevention of Significant
Deterioration of Air Quality (PSD) regulations under 40 CFR 52.21. This
document also announces that a final PSD permit has been issued to TMP
by the Shasta pursuant to the terms and conditions of the District's
delegation of authority from the U.S. EPA under 40 CFR 52.21(u).
DATES: The effective date for the Board's decision is May 30, 2001.
FOR FURTHER INFORMATION CONTACT: Duong Nguyen, Permits Office (AIR3),
Air Division, U.S. EPA Region IX, 75 Hawthorne Street, San Francisco,
CA 94105, (415) 744-1142.
SUPPLEMENTARY INFORMATION: On February 20, 2001, the District issued a
revised Authority to Construct (ATC) to TMP for the construction of a
new electricity generating plant in Burney, CA. The revised ATC
reflected information and comments provided by TMP, interested parties,
and the public through February 20, 2001. The revised ATC also
constituted a final PSD Permit pursuant to 40 CFR 52.21, the terms and
conditions of the District's delegation of authority from the U.S. EPA
under 40 CFR 52.21(u), and Section 7 of the federal Endangered Species
Act. Subsequent to the issuance of the revised ATC, the Burney
Resources Group filed a petition for review of the ATC with the Board
on March 21, 2001. On May 30, 2001, the Board denied review of the
petition for the following reasons: (1) Petitioner has not shown that
the District's selection of a 2.5 ppm (averaged over one hour)
NOX limit as BACT to be clearly erroneous or an exercise of
discretion or an important policy consideration that the Board should,
in its discretion, review; (2) the District's selection of a 4 ppm
(averaged over three hours) CO limit is consistent with the BACT limit
established for other sources in Region IX; (3) the District's
elimination of SCONOX, a new control technology, during the
BACT review did not materially affect the final determination of the
limit constituting BACT, since this limit would be achieved with either
a selective catalytic reduction (SCR) system or SCONOX; (4)
the District's selection of a 5 ppm ammonia slip is the most stringent
ammonia control in PSD permits issued in Region IX and Petitioner's
argument that the ammonia slip will form secondary PM10 is
highly speculative in nature; and (5) issues regarding PM10
and SO2 offsets and mitigation measures are not within the
purview of the federal PSD program. (See In re: Three Mountain Power,
LLC, PSD Appeal No. 01-05.)
Pursuant to 40 CFR 124.19(f)(1), for purposes of judicial review,
final Agency action occurs when a final PSD permit is issued and Agency
review procedures are exhausted. This document is being published
pursuant to 40 CFR 124.19(f)(2), which requires notice of any final
agency action regarding a permit to be published in the Federal
Register. This action being published today in the Federal Register
constitutes notice of the final Agency action denying review of the PSD
permit and, consequently, notice of the District's issuance of final
PSD permit No. 99-PO-01 to Three Mountain Power, LLC, on February 20,
2001.
[[Page 42957]]
The proposed power plant, located near the town of Burney, Shasta
County, California, will have a nominal electrical output of 500 MW and
will be fired on natural gas. The proposed facility will be subject to
PSD for Nitrogen Oxides (NOX), Carbon Monoxide (CO),
Volatile Organic Compounds (VOC), and Particulate Matter
(PM10). The permit includes the following Best Available
Control Technology (BACT) emission limits: NOX at 2.5 ppmvd
(based on 1-hour averaging at 15% O2), 4 ppmvd CO (based on
3-hour averaging at 15% O2), 2 ppmvd VOC (based on 1-hour
averaging at 15% O2), and PM10 at 0.0012 grain/
dscf (based on 1-hour averaging at 3% CO2). The BACT
requirements include use of Selective Catalytic Reduction (SCR) for the
control of NOX emissions, an oxidation catalyst for CO and
VOC emissions, and a combination of good combustion control and natural
gas for the control of PM10 emissions. Continuous emission
monitoring is required for NOX, CO and opacity. The facility
is also subject to New Source Performance Standards, Subparts AA and
GG, and the Acid Rain program under title IV of the Clean Air Act.
If available, judicial review of these determinations under section
307(b)(1) of the CAA may be sought only by the filing of a petition for
review in the United States Court of Appeals for the appropriate
circuit within 60 days from the date on which this document is
published in the Federal Register. Under section 307(b)(2) of this Act,
this determination shall not be subject to later judicial review in any
civil or criminal proceedings for enforcement.
Dated: July 30, 2001.
Jack P. Broadbent,
Director, Air Division, Region IX.