[Federal Register: February 21, 2001 (Volume 66, Number 35)]
[Notices]               
[Page 11008-11009]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr21fe01-44]                         

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Docket No. EA-232]

 
Application to Export Electric Energy; OGE Energy Resources, Inc.

AGENCY: Office of Fossil Energy, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

[[Page 11009]]

SUMMARY: OGE Energy Resources, Inc. (OERI) has applied for authority to 
transmit electric energy from the United States to Canada pursuant to 
section 202(e) of the Federal Power Act.

DATES: Comments, protests or requests to intervene must be submitted on 
or before March 23, 2001.

ADDRESSES: Comments, protests or requests to intervene should be 
addressed as follows: Office of Coal & Power Im/Ex (FE-27), Office of 
Fossil Energy, U.S. Department of Energy, 1000 Independence Avenue, 
SW., Washington, DC 20585-0350 (FAX 202-287-5736).

FOR FURTHER INFORMATION CONTACT: Xavier Puslowski (Program Office) 202-
586-4708 or Michael Skinker (Program Attorney) 202-586-2793.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated and require authorization 
under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. 
824a(e)).
    On February 6, 2001, the Office of Fossil Energy (FE) of the 
Department of Energy (DOE) received an application from OERI to 
transmit electric energy from the United States to Canada. OERI is an 
Oklahoma corporation created for the purposes of marketing electricity, 
natural gas and other energy commodities throughout North America. OERI 
will purchase the power to be exported from electric utilities and 
Federal power marketing agencies in the United States.
    OERI proposes to arrange for the delivery of electric energy to 
Canada over the existing international transmission facilities owned by 
Basin Electric Power Cooperative, Bonneville Power Administration, 
Citizens Utilities Co., Detroit Edison Company, Eastern Maine Electric 
Cooperative, Joint Owners of the Highgate Project, Long Sault, Inc., 
Maine Electric Power Company, Maine Public Service Company, Minnesota 
Power and Light Inc., Minnkota Power Cooperative, New York Power 
Authority, Niagara Mohawk Power Corporation, Northern States Power, and 
Vermont Electric Transmission Company. The construction, operation, 
maintenance, and connection of each of the international transmission 
facilities to be utilized by OERI, as more fully described in the 
application, has previously been authorized by a Presidential permit 
issued pursuant to Executive Order 10485, as amended.

Procedural Matters

    Any person desiring to become a party to this proceeding or to be 
heard by filing comments or protests to this application should file a 
petition to intervene, comment or protest at the address provided above 
in accordance with Secs. 385.211 or 385.214 of the FERC's Rules of 
Practice and Procedures (18 CFR 385.211, 385.214). Fifteen copies of 
each petition and protest should be filed with the DOE on or before the 
date listed above.
    Comments on the OERI application to export electric energy to 
Canada should be clearly marked with Docket EA-232. Additional copies 
are to be filed directly with Michael J. Foster, Esq., Contract 
Administration, Enogex Inc., 600 Central Park Two, 515 Central Park 
Drive, Oklahoma City, OK 73105.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to the National 
Environmental Policy Act of 1969, and a determination is made by the 
DOE that the proposed action will not adversely impact on the 
reliability of the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above or by 
accessing the Fossil Energy Home Page at http://www.fe.doe.gov. Upon 
reaching the Fossil Energy Home page, select ``Regulatory Programs,'' 
then ``Electricity Regulation,'' and then ``Pending Proceedings'' from 
the options menus.

    Issued in Washington, D.C., on February 13, 2001.
Anthony J. Como,
Deputy Director, Electric Power Regulation, Office of Coal & Power Im/
Ex, Office of Coal & Power Systems, Office of Fossil Energy.
[FR Doc. 01-4236 Filed 2-20-01; 8:45 am]
BILLING CODE 6450-01-P