[Federal Register: January 15, 1999 (Volume 64, Number 10)] [Notices] [Page 2639-2640] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr15ja99-60] ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-5498-8] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared December 28, 1998 through January 01, 1999 pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 564-7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 10, 1998 (62 FR 17856). Draft EISs ERP No. D-AFS-L65311-ID Rating EC2, North Fork St. Joe River Project, Implementation, Idaho Panhandles National Forest, St. Joe Ranger District, Shoshone County, ID. Summary: EPA expressed environmental concerns. EPA requested [[Page 2640]] more information to ensure that antidegradation requirements for water quality will be met, to discuss project impact to health ecosystem, and to further address cumulative impacts of this and other projects in the area. ERP No. D-COE-L03008-AK Rating EO2, Beaufort Sea Oil and Gas Development Northstar Project, Implementation, NPDES Permit, Sea Island, Alaskan Beaufort Sea, Offshore Marine Environment and Onshore Northslope of Alaskan Coastal Plain, AK. Summary: EPA expressed environmental objections to the proposed Northstar project which were related to the risks of leaks and spills associated with the use of undersea pipelines in the Beaufort Sea, the technological/logistical difficulties in responding to oil spills, and the extent to which issues and concerns of the Inupiats Eskimoes have been addressed in the development of the project and the EIS. EPA believes that further evaluation of double-walled undersea pipeline option and the Northstar Oil Discharges Prevention and Contingency Plan is necessary, and that further development of the project and EIS should be conducted in consultation with the Inupiats to ensure that their issues are addressed in a manner consistent with Executive Orders 12898 and 13084. ERP No. D-FHW-G40151-TX Rating LO, US-190 Corridor from FM2657 to the East City Limits of Copperas Cove, Transportation Improvements, Major Investment Study, Coryell and Lampasas Counties, TX. Summary: EPA had no objection to the selection of the preferred alternative, Alternative G, as described in the draft EIS. ERP No. DA-COE-K32023-HI Rating EO2, Ma'aLaea Harbor Improvements for Light-Draft-Vessels, Entrance Channel Realignment and Breakwater Modification, Additional Information, Island of Maui, Maui County, HI. Summary: EPA expressed environmental objections related to water quality and Clean Water Act Section 404 issues. The SDEIS showed exceedances in water quality standards for turbidity during construction and project operation due to increased turbulence caused by additional vessel traffic from the 130 new berths. EPA believes that the Corps should ensure that there are mechanisms in place to maintain EPA-approved Water Quality Standards. EPA asked that the Corps' final report to Congress on fiscal authorization not proceed until there are satisfactory assurances from the State that onshore sewage improvements would be put into place. Final EISs ERP No. F-AFS-K65272-CA, Chico Genetic Resource Center for Pest Management Program, Implementation, Mendocino National Forest, Willow, Butte County, CA. Summary: Review of the Final EIS was not deemed necessary. No formal comment letter was sent to the preparing agency. ERP No. F-AFS-L65160-ID, North Round Valley Timber Sales and Road Construction, Implementation, Payette National Forest, New Meadows Ranger District, Adams County, ID. Summary: Review of the Final EIS was not deemed necessary. No formal comment letter was sent to the preparing agency. ERP No. F-FHW-E40761-NC, US 64 Bypass Transportation Improvements Project, from I-440 to US 64 west of Wendell and Eastern Wake Expressway from existing US 64 to NC-1007 (Poole Road), Funding and COE Section 404 Permit, Wake County, NC. Summary: EPA found the document generally addressed the agency's comments on the draft EIS. However, lack of coordinated multi-modal transportation planning was noted. Dated: January 12, 1999. William D. Dickerson, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 99-1017 Filed 1-14-99; 8:45 am] BILLING CODE 6560-50-P