[Federal Register: December 23, 1999 (Volume 64, Number 246)] [Notices] [Page 72077-72078] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr23de99-53] ======================================================================= ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6249-4] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared December 6, 1999 through December 10, 1999 pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 564-7176. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 10, 1998 (63 FR 17856). Draft EISs ERP No. D-AFS-J60020-00 Rating EC2, Yellowstone Pipeline Missoula to Thompson Falls Reroute, Construction and Operation, Special-Use- Permit and Right-of-Way Easement, Missoula, Sanders and Mineral Counties, MT and Shoshone County, ID. Summary: EPA supports the preferred alternative, however EPA expressed environmental concerns regarding potential surface and ground water quality impacts from potential pipeline spills and recommended using an industry state-of-the-art pipeline leak detection system. EPA recommends including protective measures for the existing pipeline west of Thompson Falls. ERP No. D-FHW-C40149-NY Rating EC2, Albany Shaker Road and Watervliet Shakey Road Improvement Project, Construction and Reconstruction, Funding and COE Section 404 Permit, Town of Colonie, Albany County, NY. Summary: EPA expressed environmental concerns regarding potential impacts to wetlands and air quality. EPA requested that additional information regarding the minimization [[Page 72078]] measures and proposed mitigation plans for wetlands, as well as a more thorough cumulative impacts evaluation for wetlands and air quality should be included in the final EIS. ERP No. D-FRC-E03008-00 Rating EC2, Florida Gas Transmission Phase IV Expansion Project (Docket No. CP99-94-000), To Deliver Natural Gas to Electric Generator, FL and MS. Summary: EPA expressed environmental concern regarding the impact of 297 acres of wetlands including 100 acres of forested wetlands, 72 perennial waterways and 62 residences within 50 ft of the construction ROW, and that the project would induce secondary development impacts. EPA requested additional information on certain alternatives/variations and of Environmental Justice. ERP No. D-FTA-C40150-NY Rating EC2, Manhattan East Side Transit Alternatives Study, (MESA), Improve Transit Access Lower Manhattan, Lower East Side, East Midtown, Upper East Side and East Harlem, Major Investment Study, New York, NY. Summary: EPA expressed environmental concerns regarding the air quality analysis and alternatives. EPA requested that this issue be clarified and be included in the next document. ERP No. D-NPS-C61010-NJ Rating EC2, Great Egg Harbor National Scenic and Recreation River, Comprehensive Management Plan, Implementation, Atlantic Gloucester, Camden and Cape May Counties, NJ. Summary: EPA expressed environmental concerns with the CMP recommendations to enhance and protect the River's water quality. The final EIS should include a funding plan, and a detailed plan for periodic evaluation of the implementation and success of the CMP. ERP No. D-NPS-F39038-00 Rating EC2, Lower Saint Croix National Scenic Riverway Cooperative Management Plan, Implementation, MN and WI. Summary: EPA expressed concerns regarding potential water quality impacts and the lack of baseline data/indicators. EPA requested that these issues be clarified in the final document. ERP No. D-USN-C11016-NY Rating EC2, Brooklyn Naval Station Disposal and Reuse, Implementation, King County, NY. Summary: EPA expressed environmental concerns regarding impacts to the Brooklyn/Queens Aquifer System and historic resources, and requested that additional information be presented in the final EIS to address these issues. Final EISs ERP No. F-AFS-K65307-CA Herger-Feinstein Quincy Library Group Forest Recovery Act, Establishing and Conducting a Pilot Project, Lassen, Plumas and Tahoe National Forests, Shasta, Lassen, Tehama, Yuba, Plumas and Battle Counties, CA. Summary: EPA expressed environmental objections with the designation of Alternative 3 as the ``environmentally preferable alternative,'' given Alternative 5 would provide maximum level of resource protection with the minimum level of new disturbance. EPA suggested that the ROD specify mitigation for the new road construction and provide a map of spotted owl habitat excluded from harvest. ERP No. F-COE-L90028-WA Programmatic EIS--Puget Sound Confined Disposal Site Study, Implementation, WA. Summary: No formal comment letter sent to the preparing agency. ERP No. FS-AFS-L82015-ID St. Joe Noxious Weed Control Project, Implementation, St. Maries River, St. Joe River and Little North Fork Clearwater River, Benewah, Shoshone and Latah Counties, ID. Summary: No formal comment letter sent to the preparing agency. ERP No. F1-AFS-L61218-ID Frank Church--River of No Return Wilderness (FC-RONRW), Implementation for the Future Management of Land and Water Resource, Bitterroot, Boise, Nez Perce, Payette and Salmon- Challis National Forests, ID. Summary: No formal comment letter was sent the preparing agency. Dated: December 20, 1999. William D. Dickerson, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 99-33358 Filed 12-22-99; 8:45 am] BILLING CODE 6550-50-U