2007 Performance Track Annual Performance Report

















ETHICON - San Angelo
A060007
Year 1 Annual Performance Report
Member Since 2001 (3rd Member Term)



























SECTION A: GENERAL FACILITY INFORMATION


ETHICON - San Angelo

 
Johnson & Johnson

  Mr. Norman E. Shain
  Staff Environmental Engineer
  325 482 5331
  325 482 5196
  nshain@ethus.jnj.com


3348 Pulliam St.
San Angelo
TX
76905


http://www.ethicon.com

More than 1,000

339113


Ethicon San Angelo is a medical devices manufacturing facility engaged primarily in the manufacture and sterilization of sutures. The facility manufactured 34million needles/year and attaches, packages and sterilizes 170 million sutures/year.

Ethicon San Angelo is located on a 110 acre campus in the northwest corner of San Angelo with approximately 400,000 square feet of manufacturing under roof. The general location of the campus is rural and on the edge of the San Angelo city limits. The entire 110-acre campus is JnJ/Ethicon property with no other industrial activity on the site.

No



SECTION B: ENVIRONMENTAL MANAGEMENT SYSTEM


Yes


July 2007
ISO 14001 Standards
Specify:
Name: Randle Bunner
Title: Lead Assessor
Organization: ERM Certification and Verification Services, Inc.
Policy, Planning, Implementation, Checking, Management
Entire Facility



Yes

July 2007
Implementation, Checking
Entire Facility



Yes

August 2007
Clean Air Act (CAA)
Emergency Planning & Community Right-To-Know Act (EPCRA)
Resource Conservation and Recovery Act (RCRA)
Superfund Amendments and Reauthorization Act/Comprehensive Environmental Response, Compensation, and Liability Act (SARA/CERCLA)





Yes


Yes

Mr.  Mike Beck
  Plant Manager


November 2007



SECTION C: ENVIRONMENTAL PERFORMANCE RESULTS



Goal 1: ETHICON - San Angelo's first goal is to invest in renewable energy sources.
Ethicon San Angelo continues to pursue the opportunity for installation of wind turbines on site to generate 6 to 8 megawatts of renewable energy. In 2007 it was anticipated that construction of the installation would be underway by late 2008 or early 2009. The project has not, however, been presented to corporate yet and while the project is still on track, start of construction has been pushed back at least a year to late 2009.

An 80 meter weather tower was installed to gather weather data for the project proposal with data collection completed earlier this year. The weather data as well as finances are currently being evaluated and final project submittal to JnJ is expected within the next few months.
Electricity and natural gas energy usage in measured from metering.
ETHICON Corporation purchases RECs and allocates them to the various facilities. This is not a facility level activity.


26,074,005 25,635,778 Kwh
0 0.0 Kwh
88,964.51 87,469.27 MMBtus

ERCOT All


EPA will be determining the greenhouse gases associated with the generation of the steam that you purchase. We will be contacting you for additional information regarding the source of the steam generated.
0 0.0 MMBtus
88,964.51 87,469.27

61.6 MMBtus
0.0 MMBtus
0.00 MMBtus
0.00 61.60

1,156.54 1,137.10 21,611.63
87,807.97 86,393.77 67,352.88
88,964.51 87,530.87 88,964.51
16,817.73 16,538.34 12,900.00
9,755
16,817.73 6,783.34 12,900.00


1.0 1.0
88,964.51 87,530.87 n/a MMBtus
16,817.73 6,783.34 n/a MTCO2E

dozens of sterilized product produced




Goal 2: ETHICON - San Angelo's second goal is to reduce the facility's total water use.
Water conservation efforts centered around outside irrigation have reduced water usage for 2007 approximately 10% against 2006 baseline.
This reduction was achieved through continuing implementation of xerascaping to replace water demanding shrubs and ornamental horticulture with drought tolerant landscaping as well as decreasing the water used for irrigation in 2007.

Actual consumption numbers, as metered, are electronically collected daily and reported monthly for the four mains supplying the facility. This data is then used to evaluate and focus water conservation efforts and activities.

 
 
2006
2007
2008
2009
Actual Quantity (per year) 35,843,000 31,307,000 n/a Gallons

Normalizing Factor 1.0 1.0
Normalized Quantity 35,843,000 31,307,000.00 30,000,000 Gallons

dozens of sterilized product produced







Goal 3: ETHICON - San Angelo's third goal is to reduce the generation of, and improve the management of, the facility's non-hazardous waste.
Recycling opportunities continue to be pursued. Ethicon San Angelo is currently in conversations with a vendor to recycle/reclaim all landfill waste by the end of 2008. However, recent financial issues have caused this date to be pushed back to 2009.
Nonhazardous waste generation has increased from 1,074.23 tons in 2006 to 1132.87 tons in 2007, a 58.64 ton/year increase or a 5.5% increase. I have no additional information about this increase at this time.

Landfill waste tonnage as weighed at the landfill scales are provided by the landfill operator, Trashaway, to the facility on a monthly basis in units of tons. Tonnage numbers for recycleable materials, by stream, are provided by the recycle vendor to the facility on a monthly basis.

As of 6/10/2008, the total nonhazardous waste in 2006 was changed from 1,074.23 tons to 1,038.75 tons because of a reporting error.

2006
2007
2008
2009
Reused/recycled off-site 1,380,500 1,355,015 Pounds
Landfill 686,000 1,152,160 Pounds
Incineration 0.41 0.28 Tons
Other management

 Fuel Blending
5.09 5.09 Tons

Total Non Hazardous Waste 1,038.75 1,258.96 n/a Tons


Normalizing Factor 1.0 1.0
Total Non Hazardous Waste 1,038.75 1,258.96 1,038.75 Tons

dozens of sterilized product produced






In the table below, please provide a narrative summary of progress made toward EMS objectives and targets other than those reported as Environmental Performance Goals. You may limit the summary to environmental aspects that are significant and towards which progress has been made during the reporting year.

Do you have additional environmental aspects to report?   No







SECTION D: PUBLIC OUTREACH AND PERFORMANCE REPORTING


Ethicon, in it's capacity as a member of the community, strives to be involved in community activities at both a company and personal level. As such, potential community environmental concerns which have been identified and are not associated with Ethicon activities primarily include river cleanup and waste management issues.
Members of facility management sit on various city boards. For the issues of river clean up and waste management, members of management sit on the Keep San Angelo Beautiful (KSAB) city board. Additionally the facility supports community activities including Earth Day, and other city activities.

No environmental community concerns identified.

Information is available on the company website, www.ethicon.com and on the Johnson and Johnson website, www.jnj.com

Press Releases, Bulletin Board, Events, Web Site
URL: http://www.ethicon.com








OMB No. 2010-0032

SECTION E: SELF-CERTIFICATION OF CONTINUED PROGRAM PARTICIPATION FOR ANNUAL PERFORMANCE REPORT


The U.S. Environmental Protection Agency is not yet in a position to accept electronic signatures and therefore requests a faxed, signed copy of the Section E page. Please complete Section E online, then print Section E using the link on the Overview page. Section E should be signed by the senior manager of your facility and faxed it to the Performance Track Information Center at (617) 354-0463.

On behalf of ETHICON - San Angelo, I certify that:

  • I have read and agree to the terms and conditions as specified in the National Enviromental Performance Track Program Guide. This facility, to the best of my knowledge, continues to meet all program criteria;

  • I have personally examined and am familiar with the information contained in this Annual Performance Report. The information contained in this report is, to the best of my knowledge and based on reasonable inquiry, true, accurate, and complete;

  • My facility has an environmental management system (EMS), as defined in the Performance Track EMS criteria, including systems to maintain compliance with all applicable federal, state, tribal, and local environmental requirements, in place at the facility, and the EMS will be maintained for the duration of the facility's participation in the program;

  • My facility has conducted an objective assessment of its compliance with all applicable federal, state, tribal, and local environmental requirements; and the facility has corrected all identified instances of potential or actual noncompliance; and

  • Based on the foregoing compliance assessments and subsequent corrective actions (if any were necessary), my facility is, to the best of my knowledge and based on reasonable inquiry, currently in compliance with applicable federal, state, tribal, and local environmental requirements.

I agree that EPA's decision whether to accept participants into or remove them from the National Environment Performance Track is wholly discretionary, and I waive any right that may exist under any law to challenge EPA's acceptance or removal decision. I am the senior manager with responsibility for the facility and am fully authorized to execute this statement on behalf of the corporation or other legal entity whose facility is part of the National Environmental Performance Track program.

______________________________________________________
Mr. Mike Beck
Plant Manager
ETHICON - San Angelo
3348 Pulliam St.
San Angelo, TX 76905

,
A060007