A.1 | Name of your facility: |
| ETHICON - San Angelo
|
A.2 | Name of your parent company: |
| Johnson & Johnson
|
A.3 | Facility contact person for the Performance Track program: |
|   Name: | Mr. Tahseen Khan |
|   Title: | Staff Environmental Engineer |
|   Phone: | 325-482-5419 |
|   Fax: | 325-482-5233 |
|   Email: | tkhan2@ethus.jnj.com |
A.4 | Facility location: |
|   Street Address: | 3348 Pulliam St. |
|   Address Cont: | |
|   City: | San Angelo |
|   State: | TX |
|   Zip Code: | 76905 |
| Mailing address (if different from above): |
|   Mailing Address: | |
|   Address Cont: | |
|   City: | |
|   State: | |
|   Zip Code: | |
A.5 | Facility's website address (if any): |
| http://www.ethicon.com |
A.6 | Number of employees (full-time equivalents) who currently work in the facility: |
| More than 1,000 |
A.7 | North American Industrial Classification System (NAICS) Code(s) that is(are) used to classify business at the facility: |
| 39112         |
A.8 | In your application and, perhaps, in previous annual performance reports, you described what your facility does or makes. Have there been any (additional) changes to your facility's list of products and/or activities? If yes, please list them here: |
| No Changes |
|
|
A.9 | Have the environmental requirements applicable to your facility changed during this reporting period? If yes, please describe these changes here. |
| No Changes |
| No Changes |
B.1.d | (Optional) If you would like to describe any other audits or inspections that were conducted at your facility, please do so here.
| |
|
| |
B.1.e | Briefly summarize corrective actions taken and other improvements made as a result of your EMS assessments and compliance audits.
| |
|
As a result of the self-assessment, the facility enhanced its Emergency Preparedness Program, Contractor Management Program and its Training Program.
| |
B.1.f | Has your facility corrected all instances of potential non-compliance and EMS non-conformance identified during your audits and other assessments? | |
| Yes
| |
| If no, please explain your plans to correct these instances. | |
|
| |
B.1.g | When was the last Senior Management review of your EMS completed? | |
| December  2002 | |
| Who was the senior manager present at the review? | |
| Name: Mr. Cliff Holland | |
| Title: President
| |
C.1.b | Briefly describe how you achieved improvements for this aspect or, if relevant, any circumstances that delayed progress. |
| Due to the nature of ETHICON's supply chain, raw material use data for four ETHICON's US facilties (Somerville, NJ; San Angelo, TX; San Lorenzo, PA; and Cornelia, GA) is shown on ETHICON Somerville New Jersey's Performance Track report. Improvements for this aspect in San Angelo, TX were gained by the following:
Reductions in coating solution use.
|
C.1.c | Please list any other EPA voluntary programs to which you are also reporting these data (e.g. Energy Star, Project XL). |
| |