[Federal Register: February 26, 1999 (Volume 64, Number 38)] [Notices] [Page 9507-9508] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr26fe99-57] ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6240-3] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared February 01, 1999 Through February 05, 1999 pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 564-7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 10, 1999 (62 FR 17856). Draft EISs ERP No. D-COE-J31027-WY Rating EO2, Little Snake Supplemental Irrigation Water Supply Project, Construction, Right-of-Way Permit and COE Section 404 Permit, Carbon County, WY. Summary: EPA objected to the proposed action given the potential significant adverse impacts associated with the Colorado River Cutthroat Trout recovery program. EPA also recommended that a new alternative which combines a reduced storage pool and increased water conservation be evaluated in the Final EIS. ERP No. D-DOI-K39053-CA Rating EC2, San Joaquin River Agreement Project, Implementation of the Meeting Flow Objectives for 1999--2010, Vernalis Adaptive Management Plan, San Joaquin, Stanislaus, Madera, Merced, Fresno and Tuolume Counties, CA. Summary: EPA supported the project, as long as it will be implemented in a manner that does not degrade existing conditions or limit future management options. EPA expressed concerns regarding impacts to water quality, groundwater, and riparian habitat and requested additional information on these issues be included in the FEIS. EPA will continue to participate in implementation of the plan and a long-term fishery management program for the San Joaquin River. ERP No. D-FAA-B51021-MA Rating EC2, Provincetown Municipal Airport Safety and Operational Enhancement Project, Improvements (1) Firefighter Equipment Garage; (2) General Aviation Parking Apron Expansion; (3) Runaway Safety Areas, and (4) a Runaway Extension, COE Section 404 Permit, Cape Cod National Seashore, Barnstable County, MA. Summary: EPA expressed environmental concerns that some alternatives considered in the DEIS were not adequately evaluated and that more information should be provided about mitigation measure associated with the runway extension proposals. ERP No. D-FHW-B40084-RI Rating EC2, Western Johnston and Cranston, Improved Highway Access to the Environmental Management District, Funding and COE Section 404 Permit, Providence County, RI. Summary: EPA requested information regarding stormwater management system for the proposed project and additional information to quantify the loss of wetland functions associated with either build alternative. Based on the available information, EPA also suggested that the Scituate Avenue extension appears to be less environmentally damaging than the Comstock Parkway extension. ERP No. DS-FHW-E40700-GA Rating EC2, Harry S. Truman Parkway, Construction from the Abercon Street Extension (GA-204) to Derenne Avenue, COE Section 404 Permit and U.S. Coast Guard Permit, Chatham County, GA. Summary: EPA's review found that althought the preferred alternatives does avoid residential and commercial properties, it crosses the Vernon River floodplain and non floodplain wetlands. Bridging the entire floodplain and avoiding wetland impact is recommended. Final EISs ERP No. F-COE-E32078-00 Savannah Harbor Section 203 Expansion Project, Channel Deepening, Harbor Improvements, Georgia Ports Authority, Federal Navigation Project, Chatham County, Ga and Jasper County, SC. Summary: EPA noted that its earlier concerns over the proposal in the Draft EIS to deepen the channel by B feet have been eliminated by the proposal in the Final EIS to examine four deepening alternative, with a maximum deepening of only 6 feet. EPA has agreed with the need to continue the evaluate process associated with deepening the Savannah Harbor via a Tier II EIS analysis. The additional data developed by its preparation will form the basis for a reasoned decision, as to whether/ how much this facility can be upgraded and the unavoidable environmental costs. ERP No. F-NOA-A91063-00 Monkfish Fishery Regulations Northeast Multispecies Fishery (FMP), Fishery Management Plan, Amendment 9, Implementation, Exclusive Economic [[Page 9508]] Zone, off the New England and Mid-Atlantic Coast. Summary: Review of the Final EIS was not deemed necessary. No formal comment letter was sent to the preparing agency. ERP No. F-NOA-B39035-MA New Bedford Harbor Environment Restoration Plan, Implementation, Acushnet River, Buzzards Bay, MA. Summary: EPA found the Final EIS responsive to our earlier concerns with the exception of two technical concerns noted in the comment letter. Dated: February 23, 1999. William D. Dickerson, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 99-4860 Filed 2-25-99; 8:45 am] BILLING CODE 6560-50-P