[Federal Register: December 17, 1998 (Volume 63, Number 242)] [Notices] [Page 69621] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr17de98-51] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP99-100-000] Columbia Gas Transmission Corporation; Notice of Application to Abandon December 12, 1998. Take notice that on December 9, 1998, Columbia Gas Transmission Corporation (Columbia), 12801 Fair Lakes Parkway, Fairfax, Virginia 22030-1046, filed under Section 7(b) of the Natural Gas Act, for authority to abandon by removal, 0.20 miles of its 4-inch line SRW-9127 located in Hocking County, Ohio all as more fully described in the application on file with the Commission and open to public inspection. The line for which Columbia requests abandonment authority is an uncoated pipeline which was used to transport gas for injection and withdrawal to a well located in the Laurel Storage Field. The well is no longer active and the property owner has requested that the line be removed. Any person desiring to be heard or make any protest with reference to said application should on or before January 4, 1999, file with the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, a motion to intervene or a protest in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the regulations under the Natural Gas Act (18 CFR 157.10). All protests filed with the Commission will be considered by it in determining the appropriate action to be taken but will not serve to make the Protesters parties to the proceeding. Any person wishing to become a party to a proceeding or to participate as a party in any hearing therein must file a motion to intervene in accordance with the Commission's Rules's. Take further notice that, pursuant to the authority contained in and subject to the jurisdiction conferred upon the Federal Energy Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and the Commission's Rules of Practice and Procedure, a hearing will be held without further notice before the Commission or its designee on this application if no motion to intervene is filed within the time required, or if the Commission on its own review of the matter finds that permission and approval of the proposed abandonment are required by the public convenience and necessity. If a motion for leave to intervene is timely filed, or if the Commission on its own motion believes that a formal hearing is required, further notice of such hearing will be duly given. Under the procedure herein provided for, unless otherwise advised, it will be unnecessary for Columbia to appear or be represented at the hearing. David P. Boergers, Secretary. [FR Doc. 98-33409 Filed 12-16-98; 8:45 am] BILLING CODE 6717-01-M