[Federal Register: March 18, 2005 (Volume 70, Number 52)]
[Notices]
[Page 13188-13189]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18mr05-69]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting
Comments, Motions To Intervene, Protests, Recommendations, and Terms
and Conditions

March 11, 2005.
    Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
    a. Type of Application: Small Conduit Exemption.
    b. Project No.: 12574-000.
    c. Date filed: February 1, 2005.
    d. Applicant: Santiam Water Control District (SWCD).
    e. Name of Project: Stayton Hydroelectric Project.
    f. Location: The Stayton Project is located on the Stayton Ditch in
Marion County, Oregon. The Stayton Ditch conveys water diverted from
the North Santiam River at the Lower Bennett Dam for agricultural,
municipal, and industrial uses. At about one quarter mile downstream,
flows in the Ditch are directed through a headgate and newly
constructed fish screen that directs fish to a pipe that returns them
to the North Santiam River. At the downstream end of the Stayton Ditch,
SWCD has also constructed a barrier that restricts upstream migration
of fish into the Ditch.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Larry Trosi, Manager, Santiam Water
Control District, 284 East Water Street, Stayton, OR 97383, (503) 769-
2669.
    i. FERC Contact: James Hunter, (202) 502-6086.
    j. Status of Environmental Analysis: This application is ready for
environmental analysis at this time, and the Commission is requesting
comments, reply comments, recommendations, terms and conditions, and
prescriptions.
    k. Deadline for filing responsive documents: The Commission
directs, pursuant to section 4.34(b) of the Regulations (see Order No.
533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that all comments,
motions to intervene, protests, recommendations, terms and conditions,
and prescriptions concerning the application be filed with the
Commission by April 11, 2005. All reply comments must be filed with the
Commission by April 27, 2005.
    Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link. The Commission strongly encourages electronic filings.
    The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
    l. Description of Project: The existing hydroelectric project
consists of: (1) An intake with trash racks at normal water surface
elevation 447 feet mean sea level (msl), (2) a 27-foot by 28-foot
powerhouse, (2) an Allis-Chalmers turbine and a 600-kilowatt generating
unit; and (3) an outlet returning flow to the Stayton Ditch at normal
water surface elevation 431 feet msl. With completion of the fish
screen and barrier enabling power production during the spring fish
migration season, the average annual energy production is expected to
be 4,320 megawatt hours.

[[Page 13189]]

    m. This filing is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street,
NE., Washington, DC 20426. The filing may also be viewed on the Web at
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket

number, here P-12574, in the docket number field to access the
document. For assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is

also available for review and reproduction at the address in item h.
above.
    n. Development Application--Any qualified applicant desiring to
file a competing application must submit to the Commission, on or
before the specified deadline date for the particular application, a
competing development application, or a notice of intent to file such
an application. Submission of a timely notice of intent allows an
interested person to file the competing development application no
later than 120 days after the specified deadline date for the
particular application. Applications for preliminary permits will not
be accepted in response to this notice.
    o. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
    p. Protests or Motions to Intervene--Anyone may submit a protest or
a motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
    q. All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,''
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. Any of these documents must be filed by providing
the original and eight copies to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An
additional copy must be sent to Director, Division of Hydropower
Administration and Compliance, Office of Energy Projects, Federal
Energy Regulatory Commission, at the above address. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.

Magalie R. Salas,
Secretary.
[FR Doc. E5-1178 Filed 3-17-05; 8:45 am]

BILLING CODE 6717-01-P