[Federal Register: August 3, 2005 (Volume 70, Number 148)]
[Notices]               
[Page 44620-44621]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr03au05-129]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 
Notice of Application Accepted for Filing and Soliciting 
Comments, Protests, and Motions To Intervene

July 25, 2005.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: 12603-000.
    c. Date filed: July 8, 2005.
    d. Applicant: Energy Recycling Company.
    e. Name and Location of Project: The proposed Klamath County Pump 
Storage Project would be located in Klamath County, Oregon and would 
occupy lands administered by the Bureau of Land Management.
    f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    g. Applicant contact: Mr. Douglas Spaulding, Manager, Energy 
Recycling Company, 1433 Utica Avenue South, Suite 162, Minneapolis, MN 
55416.
    h. FERC Contact: Tom Papsidero, (202) 502-6002.
    i. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    All documents (original and eight copies) should be filed with 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Comments, protests and 
interventions may be filed electronically via the Internet in lieu of 
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's Web site under the ``e-Filing'' link. The Commission 
strongly encourages electronic filings. Please include the project 
number (P-12603-000) on any comments or motions filed.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    j. Description of Existing Facilities and Proposed Project: The 
proposed project would consist of the following new facilities: (1) An 
upper reservoir with a maximum storage capacity of 14,300 acre-feet and 
a surface area of 199 acres at maximum normal water surface elevation 
of 5,523 feet above mean sea level (msl), impounded by two earth and 
rockfill embankments, 178 and 50-foot-high, respectively, with a crest 
elevation of 5,533 feet msl; (2) a 24-foot-diameter, 1,326-foot-long 
vertical shaft; (3) a 24-foot-diameter, 3,200-foot-long concrete-lined 
tunnel: (4) four, 12-foot-diameter, 355-foot-long, steel-lined 
penstocks; (5) a powerhouse with four 250-megawatt pump/turbines; (6) a 
1,500-foot-long by 38-foot-wide D-shaped tailrace tunnel; (7) a lower 
reservoir with a maximum storage capacity of 16,900 acre-feet and an 
area of 405 acres at maximum water surface elevation of 4,191 feet msl, 
impounded by a 49-foot-high earth and rockfill embankment, with a crest 
elevation of 4,200 feet msl; (8) a 4-mile-long, 500-kilovolt 
transmission line connecting the project to Captain Jack substation; 
and (9) appurtenant facilities. The

[[Page 44621]]

project would operate as a closed system using water obtained from 
groundwater sources. The proposed project would have an annual 
generation of 1,576,800 MWh.
    k. Location of Applications: A copy of the application is available 
for inspection and reproduction at the Commission in the Public 
Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov
 using the ``eLibrary'' link. Enter the docket number 

excluding the last three digits in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 

also available for inspection and reproduction at the address in item g 
above.
    l. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    m. Competing Preliminary Permit--Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the particular application (see 18 CFR 4.36). 
Submission of a timely notice of intent allows an interested person to 
file the competing preliminary permit application no later than 30 days 
after the specified comment date for the particular application. A 
competing preliminary permit application must conform with 18 CFR 
4.30(b) and 4.36.
    n. Competing Development Application--Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    o. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    p. Proposed Scope of Studies under Permit--A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    q. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper; See 18 C.F.R. 385.2001 (a)(1)(iii) 
and the instructions on the Commission's Web site under ``e-filing'' 
link. The Commission strongly encourages electronic filing.
    r. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT 
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', 
``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project 
Number of the particular application to which the filing refers. Any of 
the above-named documents must be filed by providing the original and 
the number of copies provided by the Commission's regulations to: The 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. An additional copy must be sent to Director, 
Division of Hydropower Administration and Compliance, Federal Energy 
Regulatory Commission, at the above-mentioned address. A copy of any 
notice of intent, competing application or motion to intervene must 
also be served upon each representative of the Applicant specified in 
the particular application.
    s. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Magalie R. Salas,
Secretary.
[FR Doc. E5-4159 Filed 8-2-05; 8:45 am]

BILLING CODE 6717-01-P