Drawbridge Operation Regulations: Newtown Creek, Dutch Kills, 
English Kills, and Their Tributaries, NY

AGENCY: Coast Guard, DHS.

[[Page 58057]]


ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the drawbridge operation regulations for the 
Metropolitan Avenue Bridge, mile 3.4, across English Kills at New York 
City, New York. Under this temporary deviation the bridge may remain in 
the closed position from 11 p.m. on October 21, 2005 through 6 a.m. on 
October 24, 2005. This temporary deviation is necessary to facilitate 
scheduled bridge maintenance.

DATES: This deviation is effective from October 21, 2005 through 
October 24, 2005.

FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First 
Coast Guard District, at (212) 668-7195.

SUPPLEMENTARY INFORMATION: The Metropolitan Avenue Bridge has a 
vertical clearance in the closed position of 10 feet at mean high water 
and 15 feet at mean low water. The existing drawbridge operation 
regulations are listed at 33 CFR 117.801(e).
    The owner of the bridge, New York City Department of Transportation 
(NYCDOT), requested a temporary deviation from the drawbridge operation 
regulations to facilitate scheduled bridge repairs, counterweight 
replacement. The bridge must remain in the closed position in order to 
perform this work.
    Under this temporary deviation the NYCDOT Metropolitan Avenue 
Bridge may remain in the closed position from 11 p.m. on October 21, 
2005 through 6 a.m. on October 24, 2005.
    This deviation from the operating regulations is authorized under 
33 CFR 117.35, and will be performed with all due speed in order to 
return the bridge to normal operation as soon as possible.

    Dated: September 23, 2005.