[April 24, 2006 (Volume 71, Number 78)]
[Unified Agenda]
[Page 22926-22927]

Department of Labor (DOL)
Mine Safety and Health Administration (MSHA)
Completed Actions


_______________________________________________________________________

1972. PART 5--FEES FOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS

Priority: Other Significant

Legal Authority: 30 USC 957

CFR Citation: 30 CFR 5

Legal Deadline: None

Abstract: MSHA published a direct final rule to amend provisions of 30 CFR part 5, ``Fees for testing, evaluation, and approval of mining products.'' MSHA has streamlined the manner in which the fee system is administered. This rule updates the existing regulation to reflect these changes, including: (1) The existing rule requires an application fee to offset costs of the initial administrative review of the application. Upon approval, this amount is deducted from the total fees due. MSHA deemed the practice to be an unnecessary administrative burden and eliminated the requirement. (2) Most fees are set on an hourly basis; however, the MSHA Stamped Notification Acceptance Program (SNAP) and Stamped Revision Acceptance (SRA) Program charged only a nominal fixed fee for acceptance of certain changes to existing approvals. Each program covered specific types of products. To streamline this process, MSHA replaced both programs with the Revised Acceptance Modification Program (RAMP), which provided one process for all types of products. (3) The previous rule required MSHA to initially research the application and provide the applicant with an estimated maximum fee prior to beginning the technical investigation of the product. To expedite the approval process, MSHA now permits the applicant to pre-authorize an amount for each approval, which in turn allows MSHA to immediately begin the technical investigation while the fee estimate is being processed.

Timetable:
________________________________________________________________________

Action                            Date                      FR Cite

________________________________________________________________________

NPRM                            08/09/05                    70 FR 46345
Direct Final Rule               08/09/05                    70 FR 46336
NPRM Comment Period End         10/11/05
Direct Final Rule Effective     11/07/05


Regulatory Flexibility Analysis Required: No

Small Entities Affected: Businesses

Government Levels Affected: None

Agency Contact: Patricia W. Silvey, Acting Director, Office of
Standards, Regulations, and Variances, Department of Labor, Mine Safety
and Health Administration, 1100 Wilson Boulevard, Room 2349, Arlington,
VA 22209-3939
Phone: 202 693-9440
Fax: 202 693-9441
Email: silvey.patricia@dol.gov

RIN: 1219-AB38

_______________________________________________________________________



Back to Top   Back to Top www.msha.gov www.dol.gov

Frequently Asked Questions | Freedom of Information Act | Customer Survey
Accessibility | Privacy & Security Statement | Disclaimers

Mine Safety and Health Administration (MSHA)
1100 Wilson Boulevard, 21st Floor
Arlington, VA 22209-3939
Phone:    (202) 693-9400
Fax-on-demand: (202) 693-9401
Technical (web) questions: Webmaster
On-line Filing Help: MSHAhelpdesk@dol.gov
or call (877) 778-6055

Contact Us