Notice: We have recently updated the 'Projects' section of the Central Federal Lands website. We have included new features and improved the pages to load faster.
All the information can be located on the sub-menu to the left.
Last Revised: 10-28-2008
The Central Federal Lands Highway Division of the Federal Highway Administration in cooperation with the Hawaii Department of Transportation is administering a construction project to improve Saddle Road in the County of Hawaii from milepost 19 to milepost 35. Improvements consist of grading, drainage, hot asphaltic concrete pavement, and superpave asphalt concrete pavement.
A construction contract was awarded to Goodfellow Brothers, Inc. on May 2, 2006 for the contract amount of $59,070,942.00.
Visit the following link to see maps and to read more about the project.
http://www.saddleroad.com/ - Supplemental Site
Road Condition Information for the period of:
October 27, 2008 forward
Driving Conditions
All new asphalt pavement is complete from the Mauna Kea Access Road to the end of the project at Mile Post 19. All permanent striping and signing is also in place with the exception of a flashing beacon near Mile Post 19 that will warn eastbound traffic that they are entering the narrow and winding old section of Saddle Road. This beacon should be in place by the end of October 2008.
Planning and Design Contact Information:
Dave Gedeon
|
Central Federal Lands Highway Division
Attn: Dave Gedeon
12300 West Dakota Avenue
Lakewood, CO 80228
|
(720)963-3723 |
720.963.3596 |
Dave.Gedeon@fhwa.dot.gov
|
|
Construction Contact Information:
|
|
|
|