Preliminary Regulatory Economic Analysis And Regulatory Flexibility Analysis Proposed Rule on Safety Standards Regarding the Recommendations
of the Technical Study Panel on The Utilization of Belt Air and the Composition and Fire Retardant Properties of Belt Materials in Underground Coal Mining (RIN 1219-AB59) [PDF Only]
Preliminary Regulatory Impact Analysis And Regulatory Flexibility Analysis for Proposed Rule on 30 CFR Part 75 RIN 1219-AA76 Underground Coal Mine Ventilation — Safety Standards for the Use of a Belt Entry as an Intake Air Course To Ventilate Working Sections and Areas Where Mechanized Mining Equipment Is Being Installed or Removed [PDF Only]
Preliminary Regulatory Economic Analysis And Regulatory Flexibility Analysis The Proposed Rule Concerning Determination of Concentration of Respirable Coal Mine Dust
(RIN-1219-AB18)
and
The Proposed Rule for Verification of Underground
Coal Mine Operators' Dust Control Plans and
Compliance Sampling for Respirable Dust
(RIN-1219-AB14) [PDF Only]
Preliminary Regulatory Impact Analysis And Regulatory Flexibility Analysis Part 6 Revised Proposed Rule - Alternate Approval Program - Using Testing and Evaluation By Independent Laboratories
And Use of Equivalent Non-MSHA Product Safety Standards For 30 CFR Parts 18, 19, 20, 22, 23, 27, 33, 35, 36, and Amending Part 7.2, and Adding Part 7.10 [PDF Only]
Preliminary Regulatory Economic Analysis And Regulatory Flexibility Analysis Proposed Rule on 30 CFR Part 46 - Proposed Standards and Regulations Training and Retraining of Miners Engaged in Shell Dredging or Employed at Sand, Gravel, Surface Stone, Surface Clay, Colloidal Phosphate, or Surface Limestone Mines [PDF Only]
Regulatory Economic Analysis
Final Rule On Emergency Mine Evacuation - Emergency Temporary Standard (06-2255 - March 9, 2006)
[PDF Only]
Regulatory Economic Analysis
Final Rule On Emergency Mine Evacuation - Final Rule to revise the March 9, 2006 Emergency Temporary Standard (06-9608 - December 8, 2006)
[PDF Only]
2005
Regulatory Economic Analysis
Final Rule On 30 CFR Part 48 Training Standards for Shaft and Slope Construction Workers at Underground Mines and Surface Areas of Underground Mines [PDF Only]
Regulatory Impact Analysis And Regulatory Flexibility Analysis For Safety Standards For Underground Coal Mine Ventilation - Belt Entry Used As An Intake Air Course To Ventilate Working Sections And Areas Where Mechanized Mining Equipment Is Being Installed Or Removed [PDF Only]
Regulatory Impact Analysis And Regulatory Flexibility Analysis Part 6 Final Rule - Testing and Evaluation By Independent Laboratories And Non-MSHA Product Safety Standards
For 30 CFR Parts 18, 19, 20, 22, 23, 27, 33, 35, 36, and Amending Part 7.2, and Adding Part 7.10 [PDF Only]
Regulatory Economic Analysis And Regulatory Flexibility Analysis Final Rule Under 30 CFR Revised Part 57.5066(b)(1), (B)(2) and Revised Part 57.5067 Final Standards and Regulations Diesel Particulate Matter Exposure of Underground Metal and Nonmetal Miners [PDF Only]
Regulatory Economic Analysis and Regulatory Flexibility Analysis Final Rule on 30 CFR 48 Training and Retraining of Miners; Experienced Miner and Supervisor Training [HTML - PDF ]