Research and Innovative Technology Administration (RITA)
Printable Version

Table 2. Short Term Items with Scores of 24

Excel | CSV

No. Group Timeframe Score Key Area Criticality Fully Addressed Addressed, Monitoring Addressed, Not Adequately Not Addressed
23 Transport 24 Filling and Purging Requirements for High Pressure Containers Med       X
24 Transport 24 Loading and Unloading Requirements for Composite Containers Med       X
25 Transport     Container Specifications          
25.3 Transport 24 Container Specifications For Reactive Type Storage Med       X