Environmental Screening Checklist and Workbook for Short Line Railroads
The environmental screening checklist and workbook is a tool designed for the short line railroad industry to help them evaluate compliance at their facility. The term facility refers to, but not limited to a railroad site overseen by owners/operators, managers, field personnel, etc. engage in railroad operations. The industry can use the checklist and workbook to evaluate their compliance of either specific activities or areas in the facility or the entire facility. While the document does not contain an exhaustive list or description of all federal environmental regulations that may apply to the specific facility, it is the responsibility of the facility to know and comply with all applicable tribal, state, and local requirements. URL: http://www.transource.org/rail.htm Rate this site!
2.
Polyether Polyols Production - Economic Impact Analysis (EIA) for the Proposed Polyether Polyols NESHAP (EPA-453/R-97/013)
Subpart PPP - (EPA-453/R-97-013), Polyether Polyol EIA for Proposed Standard. Once you link to the UATW, form can be found under the "Technical Information," "Background Information Document (BID)/Response to Comments? section. URL: http://www.epa.gov/ttn/atw/polyol/poly_eia.zip Rate this site!
3.
Polyether Polyols Production - BID, Promulgated Standard
Subpart PPP - Polyether Polyol Basis and Information Document (BID) for Promulgated Standard. Once you link to the UATW, form can be found under the "Technical Information," "Background Information Document (BID)/Response to Comments? section. URL: http://www.epa.gov/ttn/atw/polyol/polyolpg.html Rate this site!
4.
Polyether Polyols Production - BID, Proposed Standard
Subpart PPP - Polyether Polyols Basis and Information Document (BID) for Proposed Standard. Once you link to the UATW, form can be found under the 'Technical Information,' 'Background Information Document (BID)/Response to Comments? section. URL: http://www.epa.gov/ttn/atw/polyol/poly_b&p.zip Rate this site!
Aerospace Manufacturing and Rework Facilities - BID, Promulgated Standards, Addendum 7/98
Subpart GG - Aerospace Basis and Information Document (BID) for Promulgated Standards, Addendum, 7/98 URL: http://www.epa.gov/ttn/atw/aerosp/aerobid3.wpd Rate this site!
7.
Aerospace Manufacturing and Rework Facilities - BID, Promulgated Standards, Addendum 1/98
Subpart GG - Aerospace Basis and Information Document (BID) for Promulgated Standards, Addendum. Once you link to the UATW, form can be found under the "Technical Information," "Background Information Document (BID)/Response to Comments? section. URL: http://www.epa.gov/ttn/atw/aerosp/bidrev.wpd Rate this site!
8.
Aerospace Manufacturing and Rework Facilities - BID, Promulgated Standard
Subpart GG - Aerospace Basis and Information Document (BID) for Promulgated Standard. Once you link to the UATW, form can be found under the "Technical Information," "Background Information Document (BID)/Response to Comments? section. URL: http://www.epa.gov/ttn/atw/aerosp/bidvolii.zip Rate this site!
9.
Aerospace Manufacturing and Rework Facilities - BID, Proposed Standards, Preliminary Draft (Chapters 1-6)
Subpart GG - Aerospace Basis and Information Document (BID) for Proposed Standards, Preliminary Draft (Chapters 1-6).Once you link to the UATW, form can be found under the "Technical Information," "Background Information Document (BID)/Response to Comments? section. URL: http://www.epa.gov/ttn/atw/aerosp/aerobid1.zip Rate this site!
10.
Aerospace Manufacturing and Rework Facilities - Semiannual Notification Report Due Dates
The first Semiannual Report under Subpart GG is due November 1, 1999 and should include compliance information from March 1, 1999 through August 31, 1999.Subsequent semiannual reports are due May 1 and November 1 of each year, and should contain compliance information from September 1 through February 28/29 (for May reports) and March 1 through August 31 (for November reports). An example semiannual/annual report form is available for download on the UATW. Once you link to the UATW, form can be found under the "Implementation Information," "Example Notices and Reports" section. URL: http://www.epa.gov/ttn/atw/aerosp/aeroini.pdf Rate this site!