Jump to main content.


Environmental Impact Statements and Regulations; Availability of EPA Comments



[Federal Register: September 14, 2007 (Volume 72, Number 178)]
[Notices]
[Page 52556-52557]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr14se07-40]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6691-1]

Environmental Impact Statements and Regulations; Availability of
EPA Comments

    Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167.
    An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in the Federal Register dated
April 6, 2007 (92 FR 17156).

Draft EISs

EIS No. 20070185, ERP No. D-FHW-E40813-GA, Northwest I-75/I-575
Corridor Project, Transportation Improvements, Funding, Cobb and
Cherokee Counties, GA.

    Summary: EPA expressed environmental concerns about the
consideration of alternatives, lack of analysis for mobile source air
toxics, noise impacts, significant impacts to low-income and minority
communities and water quality impacts. EPA recommends several
mitigation and enhancement measures that could be implemented during
and after construction to assist in minimizing impacts to the
environment. Rating EC2.

EIS No. 20070212, ERP No. D-TVA-E39069-AL, Bear Creek Dam Leakage
Resolution Project, To Modify Dam and Maintain Summer Pool Level of 576
Feet, Bear Creek Dam, Franklin County, AL.

    Summary: EPA expressed environmental concerns about wetlands losses
through changes in reservoir pool and downstream flows. EPA recommends
monitoring and suggest that a Bear Creek Watershed Team be formed to
help control reservoir water quality. Rating EC2.

EIS No. 20070221, ERP No. D-AFS-J65483-MT, Butte Resource Management
Plan, Implementation, Beaverhead, Broadwater, Deerlodge, Gallatin,
Jefferson, Lewis and Clark, Silver Bow and Park Counties, MT.

    Summary: EPA expressed environmental concerns about impacts to
ecosystem processes, water and habitat quality. EPA requested
additional information to fully assess and mitigate all potential
impacts of management. Rating EC2.

EIS No. 20070270, ERP No. D-NRC-D09802-MD, License Renewal of the
National Bureau of Standards Reactor (NBSR), Renew the Operating
License for an Additional 20 Years, National Institute of Standards and
Technology (NIST), NUREG-1873, Montgomery County, MD.

    Summary: EPA does not object to the proposed action. Rating LO.

EIS No. 20070298, ERP No. D-AFS-J65487-UT, Millville Peak/Logan Peak
Road Relocation Project, Provide a Safe, Reliable, Ground Access Route,
Logan Ranger District, Wasatch-Cache National Forest, Cache County, UT.

    Summary: EPA expressed environmental concerns about the loss of
acreage and associated roadless values associated with constructing
five miles of new road. EPA requested additional mitigation measures to
address the safety issue posed by the high voltage power cable that is
becoming increasingly exposed and additional documentation of
``irreparable resource damage'' to the existing roads as the basis for
allowing road construction in roadless areas. Rating EC2.

EIS No. 20070305, ERP No. D-BPA-J08028-MT, Libby (FEC) to Troy

[[Page 52557]]

Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line
Project, Rebuilding Transmission Line between Libby and Troy, Lincoln
County, MT.

    Summary: EPA expressed environmental concerns about impacts to
water quality, wetlands and the avian community. EPA requested
additional information to fully assess and mitigate all potential
impacts of the proposed actions. Rating EC2.

EIS No. 20070308, ERP No. D-AFS-J65489-MT, Marten Creek Project,
Proposed Timber Harvest, Prescribed Fire Burning, Watershed
Restoration, and Associated Activities, Cabinet Ranger District,
Kootenai National Forest, Sanders County, MT.

    Summary: EPA expressed environmental concerns about impacts to
water quality and habitat quality, and recommended additional
information to assess and mitigate impacts of the proposed management
actions. Rating EC2.
EIS No. 20070267, ERP No. DA-COE-E39051-FL, Lake Okeechobee Regulation
Schedule Study, New Updated Information, Evaluation of Three New
Alternatives on Operational Changes to the Current Water Control Plan,
Lake Okeechobee and the Everglades Agricultural Area, Lake Okeechobee,
Glades, Okeechobee Hendry, Palm Beach and Martin Counties, FL.
    Summary: EPA continues to have environmental concerns about water
flow impacts on the lower river and estuaries from lake flow releases.
Rating EC1.
EIS No. 20070276, ERP No. DS-COE-E32061-MS, Pascagoula Harbor
Navigation Channel Project, To Construct Congressionally Authorized
Widening and Deepening Improvements, to update the FEIS-1985, Jackson
County, MS.
    Summary: EPA expressed environmental concerns about the potential
impacts and requested additional information. EPA's comments included a
request that every effort be made to minimize impacts to submerged
aquatic vegetation and that the Corps explore opportunities for
beneficial uses of the dredged material. EPA also requested that a
detailed sediment evaluation and testing report be submitted to ensure
that the disposal material meets the Ocean Dumping Criteria under the
Marine Research and Sanctuaries Protection Act's ocean dumping
criteria. Rating EC2.

Final EISs

EIS No. 20070263, ERP No. F-AFS-J65376-SD, Mitchell Project Area, To
Implement Multiple Resource Management Actions, Mystic Ranger District,
Black Hills National Forest, Pennington County, SD.
    Summary: EPA's previous concerns have been resolved; therefore, EPA
does not object to the proposed action.
EIS No. 20070309, ERP No. F-FRC-L05239-00, Spokane River and Post Falls
Hydroelectric Project, Applications for two New Licenses for Existing
14.75 (mw) Post Falls No. 12606 and 122.9 (mw) Spokane River No. 2545,
Kootenai and Benewah Counties, ID and Spokane, Lincoln and Stevens
Counties, WA.
    Summary: EPA continues to have environmental concerns about the
project's potential impacts to water quality. EPA recommended that the
Record Of Decision for the project include updated information about
Clean Water Act Section 401 water quality certification process, as
well as assurances that the project plans would be adjusted to meet
water quality standards in Idaho and Washington during project
implementation.
EIS No. 20070319, ERP No. F-USN-E11061-FL, Boca Chica Field,
Restoration of Clear Zones and Stormwater Drainage Systems,
Implementation, Naval Air Station (NAS) Key West, Monroe County, FL.
    Summary: EPA's previous concerns have been resolved; therefore, EPA
does not object to the proposed action.
EIS No. 20070320, ERP No. F-WPA-K05063-AZ, San Luis Rio Colorado
Project, Proposes to Construct a 26-Mile Long 230 Kilovolt Double-
Circuit Transmission Line from the International Border with Mexico to
Western and Arizona Public Service Substations near Yuma County, AZ.
    Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070321, ERP No. F-NOA-E91018-00, Amendment 27 to the Reef
Fish Fishery Management Plan and Amendment 14 to the Shrimp Fishery
Management Plan, To Address Stock Rebuilding and Overfishing of Red
Snapper, Gulf of Mexico.
    Summary: EPA has no objection to the proposed action.

    Dated: September 11, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
 [FR Doc. E7-18182 Filed 9-13-07; 8:45 am]

BILLING CODE 6560-50-P

 
 


Local Navigation


Jump to main content.