GENERAL DECISION: UT20080111 12/19/2008 UT111 Date: December 19, 2008 General Decision Number: UT20080111 12/19/2008 State: Utah Construction Type: Highway County: Millard County in Utah. Modification Number Publication Date 0 10/31/2008 1 12/19/2008 ENGI0003-059 07/01/2008 Rates Fringes POWER EQUIPMENT OPERATOR (3) Backhoe Loader Combination.................$ 24.53 12.71 (4) Asphalt Laydown Machine, Oil Distributor....$ 23.53 12.71 Crane (Under 35 tons).....$ 24.86 12.71 Crane (35 to 100 tons).....$ 26.15 12.71 Crane (Over 100 tons)......$ 27.49 12.71 ---------------------------------------------------------------- IRON0027-003 07/01/2008 Rates Fringes IRONWORKER, REINFORCING AND STRUCTURAL (Excluding Fence Erection and Guard Rail Installation)....................$ 25.61 10.60 ---------------------------------------------------------------- * LABO0295-033 07/01/2008 Rates Fringes LABORER (4)Asphalt Shoveler.........$ 18.16 5.40 ---------------------------------------------------------------- SUUT2008-065 09/10/2008 Rates Fringes CARPENTER, Including Form Work...$ 17.51 2.84 CEMENT MASON/CONCRETE FINISHER...$ 17.36 2.04 INSTALLER - GUARDRAIL............$ 13.11 0.00 LABORER: Asphalt Raker..........$ 12.18 2.60 LABORER: Common or General......$ 13.37 2.65 LABORER: Fence Erector..........$ 15.27 2.79 LABORER: Flagger................$ 8.77 2.53 LABORER: Landscape..............$ 14.45 2.79 LABORER: Mason Tender - Cement/Concrete..................$ 9.00 0.36 LABORER: Pipelayer..............$ 15.52 2.79 LABORER: Power Tool Operator: (Chain/Concrete Saw, Dirt Compactor (Hand Held), Hand Held Drill, Jackhammer/Tamper and Vibrator Only)...............$ 14.47 3.01 OPERATOR: Asphalt Paver.........$ 20.59 6.67 OPERATOR: Asphalt Roller........$ 15.82 4.00 OPERATOR: Blade/Grader..........$ 19.42 5.95 OPERATOR: Broom.................$ 15.88 5.65 OPERATOR: Bulldozer.............$ 21.78 7.04 OPERATOR: Crusher...............$ 24.64 4.76 OPERATOR: Grade Setter..........$ 20.21 7.08 OPERATOR: Mechanic..............$ 19.10 5.71 OPERATOR: Oiler.................$ 20.74 5.89 OPERATOR: Roller (Dirt and Grade Compaction)................$ 16.39 6.12 OPERATOR: Rotomill..............$ 24.25 6.00 OPERATOR: Scraper...............$ 21.51 5.57 OPERATOR: Screed................$ 15.88 4.04 OPERATOR: Trackhoe..............$ 16.00 1.59 OPERATOR: Backhoe/Excavator/Trackhoe.......$ 19.62 6.02 OPERATOR: Front End Loader.......$ 20.63 6.92 PAINTER, Including Parking Lot and Highway Line Striping....$ 14.05 1.62 SIGN Installer (Permanent and Temporary Road Signs)............$ 15.40 2.79 Traffic Control: Sets Cones and Barrels......................$ 17.14 2.79 TRUCK DRIVER.....................$ 17.41 4.52 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in he matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION