|
|
|
|
|
|
Publications and Presentations
- Next Generation 9-1-1 System Initiative - Proof of Concept Testing Report [PDF 1.52MB]
- Next Generation 9-1-1 System Initiative - Proof of Concept Test Plan [HTML, PDF 1.42MB]
- Preliminary Transition Plan [HTML, PDF 1.87MB]
- Data Acquisition and Analysis Plan [HTML, PDF 1.80MB]
- NG9-1-1 Transition Issues Report [HTML, PDF 792KB]
- Proof of Concept Deployment Plan [HTML, PDF 3.52MB]
- Executive Summary: Preliminary Analysis of Cost, Value, and Risk [HTML, PDF 205KB]
- Preliminary Analysis of Cost, Value, and Risk [HTML, PDF 1.22MB]
- Human Machine Interface Display Design Document [HTML, PDF 7.27MB]
- NG9-1-1 Architecture Analysis Report [HTML, PDF 4MB]
- NG9-1-1 System Description and Requirements Document [HTML, PDF 6.20MB]
- Next Generation 9-1-1 System Initiative - Concept of Operations [ HTML, PDF 5.68MB]
- Mission Critical Magazine, April 2007, publishes 'the latest' on NG9-1-1[PDF 190KB]
- Next Generation 9-1-1 System Preliminary Concept of Operations [HTML, PDF 1.39KB]
- Request for Information (RFI) [HTML, DOC 51KB]
- RFI Response Summary [HTML, DOC 105KB]
- Overview Presentation [HTML, PPT 85KB]
Updated
October 28, 2008 9:43 AM
|
|
|
|