Title 40--Protection of Environment

CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY

PART 270--EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM


TEXT PDF270.1 Purpose and scope of these regulations.
TEXT PDF270.2 Definitions.
TEXT PDF270.3 Considerations under Federal law.
TEXT PDF270.4 Effect of a permit.
TEXT PDF270.5 Noncompliance and program reporting by the Director.
TEXT PDF270.6 References.
TEXT PDF270.10 General application requirements.
TEXT PDF270.11 Signatories to permit applications and reports.
TEXT PDF270.12 Confidentiality of information.
TEXT PDF270.13 Contents of part A of the permit application.
TEXT PDF270.14 Contents of part B: General requirements.
TEXT PDF270.15 Specific part B information requirements for containers.
TEXT PDF270.16 Specific part B information requirements for tank systems.
TEXT PDF270.17 Specific part B information requirements for surface impoundments.
TEXT PDF270.18 Specific part B information requirements for waste piles.
TEXT PDF270.19 Specific part B information requirements for incinerators.
TEXT PDF270.20 Specific part B information requirements for land treatment facilities.
TEXT PDF270.21 Specific part B information requirements for landfills.
TEXT PDF270.22 Specific part B information requirements for boilers and industrial furnaces burning hazardous waste.
TEXT PDF270.23 Specific part B information requirements for miscellaneous units.
TEXT PDF270.24 Specific part B information requirements for process vents.
TEXT PDF270.25 Specific part B information requirements for equipment.
TEXT PDF270.26 Special part B information requirements for drip pads.
TEXT PDF270.27 Specific Part B information requirements for air emission controls for tanks, surface impoundments, and containers.
TEXT PDF270.28 Part B information requirements for post-closure permits.
TEXT PDF270.29 Permit denial.
TEXT PDF270.30 Conditions applicable to all permits.
TEXT PDF270.31 Requirements for recording and reporting of monitoring results.
TEXT PDF270.32 Establishing permit conditions.
TEXT PDF270.33 Schedules of compliance.
TEXT PDF270.40 Transfer of permits.
TEXT PDF270.41 Modification or revocation and reissuance of permits.
TEXT PDF270.42 Permit modification at the request of the permittee.
TEXT PDF270.43 Termination of permits.
TEXT PDF270.50 Duration of permits.
TEXT PDF270.51 Continuation of expiring permits.
TEXT PDF270.60 Permits by rule.
TEXT PDF270.61 Emergency permits.
TEXT PDF270.62 Hazardous waste incinerator permits.
TEXT PDF270.63 Permits for land treatment demonstrations using field test or laboratory analyses.
TEXT PDF270.64 Interim permits for UIC wells.
TEXT PDF270.65 Research, development, and demonstration permits.
TEXT PDF270.66 Permits for boilers and industrial furnaces burning hazardous waste.
TEXT PDF270.68 Remedial Action Plans (RAPs).
TEXT PDF270.70 Qualifying for interim status.
TEXT PDF270.71 Operation during interim status.
TEXT PDF270.72 Changes during interim status.
TEXT PDF270.73 Termination of interim status.
TEXT PDF270.79 Why is this subpart written in a special format?
TEXT PDF270.80 What is a RAP?
TEXT PDF270.85 When do I need a RAP?
TEXT PDF270.90 Does my RAP grant me any rights or relieve me of any obligations?
TEXT PDF270.95 How do I apply for a RAP?
TEXT PDF270.100 Who must obtain a RAP?
TEXT PDF270.105 Who must sign the application and any required reports for a RAP?
TEXT PDF270.110 What must I include in my application for a RAP?
TEXT PDF270.115 What if I want to keep this information confidential?
TEXT PDF270.120 To whom must I submit my RAP application?
TEXT PDF270.125 If I submit my RAP application as part of another document, what must I do?
TEXT PDF270.130 What is the process for approving or denying my application for a RAP?
TEXT PDF270.135 What must the Director include in a draft RAP?
TEXT PDF270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny?
TEXT PDF270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny?
TEXT PDF270.150 How will the Director make a final decision on my RAP application?
TEXT PDF270.155 May the decision to approve or deny my RAP application be administratively appealed?
TEXT PDF270.160 When does my RAP become effective?
TEXT PDF270.165 When may I begin physical construction of new units permitted under the RAP?
TEXT PDF270.170 After my RAP is issued, how may it be modified, revoked and reissued, or terminated?
TEXT PDF270.175 For what reasons may the Director choose to modify my final RAP?
TEXT PDF270.180 For what reasons may the Director choose to revoke and reissue my final RAP?
TEXT PDF270.185 For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?
TEXT PDF270.190 May the decision to approve or deny a modification, revocation and reissuance, or termination of my RAP be administratively appealed?
TEXT PDF270.195 When will my RAP expire?
TEXT PDF270.200 How may I renew my RAP if it is expiring?
TEXT PDF270.205 What happens if I have applied correctly for a RAP renewal but have not received approval by the time my old RAP expires?
TEXT PDF270.210 What records must I maintain concerning my RAP?
TEXT PDF270.215 How are time periods in the requirements in this subpart and my RAP computed?
TEXT PDF270.220 How may I transfer my RAP to a new owner or operator?
TEXT PDF270.225 What must the State or EPA Region report about noncompliance with RAPs?
TEXT PDF270.230 May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated?
TEXT PDF270.235 Options for incinerators and cement and lightweight aggregate kilns to minimize emissions from startup, shutdown, and malfunction events.


















---------------------------------------------------------------------
















-----------

[BACK ][BACK ]