21. |
| ||||||||||||||||||||||||
Popular Title: Retroreflectivity of Road Signs | |||||||||||||||||||||||||
RIN 2125-AE98 | |||||||||||||||||||||||||
Stage: SNPRM | |||||||||||||||||||||||||
Previous Stage: NPRM: Publication Date 07/30/2004; End of Comment Period 10/28/2004; Extension of Comment Period 10/22/2004; End of Extended Comment Period 02/01/2005. | |||||||||||||||||||||||||
Abstract: This action would update the standards for retroreflectivity of traffic signs. Section 406(a) of the Department of Transportation and Related Agencies Appropriations Act of 1993, requires the Secretary of Transportation to revise the MUTCD to include a standard for a minimum level of retroreflectivity that must be maintained for traffic signs. The FHWA is interested in establishing standards for nighttime visibility of traffic signs. The FHWA will develop these standards by considering the results of research, engineering practices and comments received in response to this notice of proposed amendments. | |||||||||||||||||||||||||
Effects:
| |||||||||||||||||||||||||
Prompting action: Statute | |||||||||||||||||||||||||
| |||||||||||||||||||||||||
Rulemaking Project Initiated: 05/07/2003 | |||||||||||||||||||||||||
Dates for SNPRM:
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
Federal Register Citation for SNPRM: 71 FR 26711 |
Federal Highway Administration | |||||||||||||||||||||||||
22. |
| ||||||||||||||||||||||||
Popular Title: Tolling | |||||||||||||||||||||||||
RIN 2125-AF07 | |||||||||||||||||||||||||
Stage: NPRM | |||||||||||||||||||||||||
Previous Stage:None | |||||||||||||||||||||||||
Abstract: Pursuant to SAFETEA-LU, this rulemaking would establish requirements, standards, or performance specifications for automated toll collection systems implemented under the Express Lanes Demonstration Project. | |||||||||||||||||||||||||
Effects:
| |||||||||||||||||||||||||
Prompting action: Statute | |||||||||||||||||||||||||
| |||||||||||||||||||||||||
Rulemaking Project Initiated: 08/10/2005 | |||||||||||||||||||||||||
Dates for NPRM:
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
Federal Register Citation for NPRM: None |
Federal Highway Administration | |||||||||||||||||||||||||
23. |
| ||||||||||||||||||||||||
Popular Title: PNRS | |||||||||||||||||||||||||
RIN 2125-AF08 | |||||||||||||||||||||||||
Stage: Undetermined | |||||||||||||||||||||||||
Previous Stage:None | |||||||||||||||||||||||||
Abstract: This rulemaking would, pursuant to SAFETEA-LU, establish the manner in which the Secretary will evaluate and rate the transportation infrastructure projects based on the results of preliminary engineering, project justification, and the degree of non-Federal financial commitment. | |||||||||||||||||||||||||
Effects:
| |||||||||||||||||||||||||
Prompting action: Statute | |||||||||||||||||||||||||
| |||||||||||||||||||||||||
Rulemaking Project Initiated: 08/10/2005 | |||||||||||||||||||||||||
Dates for Undetermined:
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
Federal Register Citation for Undetermined: None |
Federal Highway Administration | |||||||||||||||||||||
24. |
| ||||||||||||||||||||
Popular Title: Planning | |||||||||||||||||||||
RIN 2125-AF09 | |||||||||||||||||||||
Stage: Final Rule | |||||||||||||||||||||
Previous Stage: NPRM: Publication Date 06/09/2006; End of Comment Period 09/07/2006. | |||||||||||||||||||||
Abstract: This rulemaking would, pursuant to SAFETEA-LU, set standards for the annual listing of projects for which Federal funds have been obligated in the preceeding year and would specify the types of data to be included in such list, including sufficient information about each project to identify its type, location, and amount obligated. | |||||||||||||||||||||
Effects:
| |||||||||||||||||||||
Prompting action: Statute | |||||||||||||||||||||
| |||||||||||||||||||||
Rulemaking Project Initiated: 08/10/2005 | |||||||||||||||||||||
Dates for Final Rule:
| |||||||||||||||||||||
| |||||||||||||||||||||
Federal Register Citation for Final Rule: None |
Federal Highway Administration | |||||||||||||||||||||
25. |
| ||||||||||||||||||||
Popular Title: Design-Build | |||||||||||||||||||||
RIN 2125-AF12 | |||||||||||||||||||||
Stage: Final Rule | |||||||||||||||||||||
Previous Stage: NPRM: Publication Date 05/25/2006;End of Comment Period 07/24/2006. | |||||||||||||||||||||
Abstract: Pursuant to SAFETEA-LU, this rulemaking would eliminate the prohibition on States issuing requests for proposals, proceeding with awards of design-build contracts, or issuing notices to proceed with preliminary design work under design-build contracts prior to compliance with section 102 of the National Environmental Policy Act of 1969 (NEPA) and requiring State Departments of Transportation or local transportation agencies to receive approval from the Secretary of Transportation before carrying out such activity. This rulemaking would also preclude a design-build contractor from proceeding with final design or construction of any permanent improvement prior to completion of the section 102 NEPA process. | |||||||||||||||||||||
Effects:
| |||||||||||||||||||||
Prompting action: Statute | |||||||||||||||||||||
| |||||||||||||||||||||
Rulemaking Project Initiated: 08/10/2005 | |||||||||||||||||||||
Dates for Final Rule:
| |||||||||||||||||||||
| |||||||||||||||||||||
Federal Register Citation for Final Rule: None |
Federal Highway Administration | |||||||||||||||||||||
26. |
| ||||||||||||||||||||
Popular Title: Project Pilot Program | |||||||||||||||||||||
RIN 2125-AF13 | |||||||||||||||||||||
Stage: Final Rule | |||||||||||||||||||||
Previous Stage: NPRM: Publication Date 04/05/2006;End of Comment Period 06/05/2006. | |||||||||||||||||||||
Abstract: This rulemaking would establish requirements relating to information required to be contained in any application of a State to participate in the Surface Transportation Project Delivery Pilot Program. | |||||||||||||||||||||
Effects:
| |||||||||||||||||||||
Prompting action: Statute | |||||||||||||||||||||
| |||||||||||||||||||||
Rulemaking Project Initiated: 08/10/2005 | |||||||||||||||||||||
Dates for Final Rule:
| |||||||||||||||||||||
| |||||||||||||||||||||
Federal Register Citation for Final Rule: None |
Federal Highway Administration | |||||||||||||||||||||
27. |
| ||||||||||||||||||||
Popular Title: 4(f) Parks | |||||||||||||||||||||
RIN 2125-AF14 | |||||||||||||||||||||
Stage: Final Rule | |||||||||||||||||||||
Previous Stage:None | |||||||||||||||||||||
Abstract: This FHWA/FTA joint rulemaking would clarify the factors to be considered and the standards to be applied in determining the prudence and feasability of alternatives under section 4(f) (138 of title 23, U.S. Code, and section 303 of title 49, U.S. Code). Section 4(f) properties include certain parks, recreation areas, wildlife and waterfowl refuges, and historic sites described in section 4(f) of the Department of Transportation Act of 1966 (P.L. 89-670). Section 4(f) generally prohibits the use of such properties for transportation projects unless the Secretary of Transportation finds there is no feasible and prudent alternative and all possible planning to minimize the harm is undertaken. | |||||||||||||||||||||
Effects:
| |||||||||||||||||||||
Prompting action: Statute | |||||||||||||||||||||
| |||||||||||||||||||||
Rulemaking Project Initiated: 08/10/2005 | |||||||||||||||||||||
Dates for Final Rule:
| |||||||||||||||||||||
| |||||||||||||||||||||
Federal Register Citation for Final Rule: None |