![](https://webarchive.library.unt.edu/eot2008/20081106124144im_/http://ecfr.gpoaccess.gov/e/ecfr/images/spacer.gif) |
|
![](https://webarchive.library.unt.edu/eot2008/20081106124144im_/http://www.gpoaccess.gov/images/spacer.gif) |
Home Page > Executive Branch > Code of Federal Regulations > Electronic Code of Federal Regulations
![blue pill](https://webarchive.library.unt.edu/eot2008/20081106124144im_/http://ecfr.gpoaccess.gov/e/ecfr/images/logo--bluepill.gif)
e-CFR Data is current as of November 4, 2008
TITLE 40--Protection of Environment
CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY
SUBCHAPTER I--SOLID WASTES
PART 264--STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES
Subpart A--GENERAL
|
Purpose, scope and applicability. |
|
|
Relationship to interim status standards. |
|
Subpart B--GENERAL FACILITY STANDARDS
|
General inspection requirements. |
|
|
General requirements for ignitable, reactive, or incompatible wastes. |
|
|
Construction quality assurance program. |
|
Subpart C--PREPAREDNESS AND PREVENTION
|
Design and operation of facility. |
|
|
Testing and maintenance of equipment. |
|
|
Access to communications or alarm system. |
|
|
Arrangements with local authorities. |
|
Subpart D--CONTINGENCY PLAN AND EMERGENCY PROCEDURES
|
Purpose and implementation of contingency plan. |
|
|
Content of contingency plan. |
|
|
Copies of contingency plan. |
|
|
Amendment of contingency plan. |
|
Subpart E--MANIFEST SYSTEM, RECORDKEEPING, AND REPORTING
|
Availability, retention, and disposition of records. |
|
|
Unmanifested waste report. |
|
Subpart F--RELEASES FROM SOLID WASTE MANAGEMENT UNITS
|
Ground-water protection standard. |
|
|
General ground-water monitoring requirements. |
|
|
Detection monitoring program. |
|
|
Compliance monitoring program. |
|
|
Corrective action program. |
|
|
Corrective action for solid waste management units. |
|
Subpart G--CLOSURE AND POST-CLOSURE
|
Closure performance standard. |
|
|
Closure plan; amendment of plan. |
|
|
Closure; time allowed for closure. |
|
|
Disposal or decontamination of equipment, structures and soils. |
|
|
Certification of closure. |
|
|
Post-closure care and use of property. |
|
|
Post-closure plan; amendment of plan. |
|
|
Certification of completion of post-closure care. |
|
Subpart H--FINANCIAL REQUIREMENTS
|
Definitions of terms as used in this subpart. |
|
|
Cost estimate for closure. |
|
|
Financial assurance for closure. |
|
|
Cost estimate for post-closure care. |
|
|
Financial assurance for post-closure care. |
|
|
Use of a mechanism for financial assurance of both closure and post-closure care. |
|
|
Incapacity of owners or operators, guarantors, or financial institutions. |
|
|
Use of State-required mechanisms. |
|
|
State assumption of responsibility. |
|
|
Wording of the instruments. |
|
Subpart I--USE AND MANAGEMENT OF CONTAINERS
|
Compatibility of waste with containers. |
|
|
Management of containers. |
|
|
Special requirements for ignitable or reactive waste. |
|
|
Special requirements for incompatible wastes. |
|
Subpart J--TANK SYSTEMS
|
Assessment of existing tank system's integrity. |
|
|
Design and installation of new tank systems or components. |
|
|
Containment and detection of releases. |
|
|
General operating requirements. |
|
|
Response to leaks or spills and disposition of leaking or unfit-for-use tank systems. |
|
|
Closure and post-closure care. |
|
|
Special requirements for ignitable or reactive wastes. |
|
|
Special requirements for incompatible wastes. |
|
Subpart K--SURFACE IMPOUNDMENTS
|
Design and operating requirements. |
|
|
Monitoring and inspection. |
|
|
Emergency repairs; contingency plans. |
|
|
Closure and post-closure care. |
|
|
Special requirements for ignitable or reactive waste. |
|
|
Special requirements for incompatible wastes. |
|
|
Special requirements for hazardous wastes FO20, FO21, FO22, FO23, FO26, and FO27. |
|
Subpart L--WASTE PILES
|
Design and operating requirements. |
|
|
Monitoring and inspection. |
|
|
Special requirements for ignitable or reactive waste. |
|
|
Special requirements for incompatible wastes. |
|
|
Closure and post-closure care. |
|
|
Special requirements for hazardous wastes FO20, FO21, FO22, FO23, FO26, and FO27. |
|
Subpart M--LAND TREATMENT
|
Design and operating requirements. |
|
|
Unsaturated zone monitoring. |
|
|
Closure and post-closure care. |
|
|
Special requirements for ignitable or reactive waste. |
|
|
Special requirements for incompatible wastes. |
|
|
Special requirements for hazardous wastes FO20, FO21, FO22, FO23, FO26, and FO27. |
|
Subpart N--LANDFILLS
|
Design and operating requirements. |
|
|
Monitoring and inspection. |
|
|
Surveying and recordkeeping. |
|
|
Closure and post-closure care. |
|
|
Special requirements for ignitable or reactive waste. |
|
|
Special requirements for incompatible wastes. |
|
|
Special requirements for bulk and containerized liquids. |
|
|
Special requirements for containers. |
|
|
Disposal of small containers of hazardous waste in overpacked drums (lab packs). |
|
|
Special requirements for hazardous wastes FO20, FO21, FO22, FO23, FO26, and FO27. |
|
Subpart O--INCINERATORS
|
Principal organic hazardous constituents (POHCs). |
|
|
Hazardous waste incinerator permits. |
|
|
Monitoring and inspections. |
|
Subparts P-R--[RESERVED]
Subpart S--SPECIAL PROVISIONS FOR CLEANUP
|
Applicability of Corrective Action Management Unit (CAMU) regulations. |
|
|
Grandfathered Corrective Action Management Units (CAMUs). |
|
|
Corrective Action Management Units (CAMU). |
|
|
Disposal of CAMU-eligible wastes in permitted hazardous waste landfills. |
|
Subparts T-V--[RESERVED]
Subpart W--DRIP PADS
|
Assessment of existing drip pad integrity. |
|
|
Design and installation of new drip pads. |
|
|
Design and operating requirements. |
|
Subpart X--MISCELLANEOUS UNITS
|
Environmental performance standards. |
|
|
Monitoring, analysis, inspection, response, reporting, and corrective action. |
|
Subparts Y-Z--[RESERVED]
Subpart AA--AIR EMISSION STANDARDS FOR PROCESS VENTS
|
Standards: Process vents. |
|
|
Standards: Closed-vent systems and control devices. |
|
|
Test methods and procedures. |
|
|
Recordkeeping requirements. |
|
Subpart BB--AIR EMISSION STANDARDS FOR EQUIPMENT LEAKS
|
Standards: Pumps in light liquid service. |
|
|
Standards: Pressure relief devices in gas/vapor service. |
|
|
Standards: Sampling connection systems. |
|
|
Standards: Open-ended valves or lines. |
|
|
Standards: Valves in gas/vapor service or in light liquid service. |
|
|
Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and flanges and other connectors. |
|
|
Standards: Delay of repair. |
|
|
Standards: Closed-vent systems and control devices. |
|
|
Alternative standards for valves in gas/vapor service or in light liquid service: percentage of valves allowed to leak. |
|
|
Alternative standards for valves in gas/vapor service or in light liquid service: skip period leak detection and repair. |
|
|
Test methods and procedures. |
|
|
Recordkeeping requirements. |
|
Subpart CC--AIR EMISSION STANDARDS FOR TANKS, SURFACE IMPOUNDMENTS, AND CONTAINERS
|
Waste determination procedures. |
|
|
Standards: Surface impoundments. |
|
|
Standards: Closed-vent systems and control devices. |
|
|
Inspection and monitoring requirements. |
|
|
Recordkeeping requirements. |
|
Subpart DD--CONTAINMENT BUILDINGS
|
Design and operating standards. |
|
|
Closure and post-closure care. |
|
Subpart EE--HAZARDOUS WASTE MUNITIONS AND EXPLOSIVES STORAGE
|
Design and operating standards. |
|
|
Closure and post-closure care. |
|
February 27, 2007< !-- #EndDate -- >-->
|