Sequoia and Kings Canyon National Parks
Fire Information Cache
Navigation Bar
BACK TO CACHE HOME
Fire Mgmt. Policy
SEQ./KINGS CANYON
NAT. PARK SERVICE
THREE RIVERS FIRE SURVEY
SEKI FIRE MGMT. PLAN & EA
Fire and Park Resources
ONLINE PAPERS
BIBLIOGRAPHY
CURRENT RESEARCH
RESEARCH NEEDS
Annual Fire Reports
INTRODUCTION
2000
1999
1998
1997
1996
1995
CURRENT FIRE INFORMATION
FIRE MAPS
GIS INFO
SNEP REPORT
FIRE GLOSSARY
FIRE LINKS
BACK TO CACHE HOME
SEKI NAT. RESOURCES HOME
SEKI FIRE MGMT
MAIN VISITOR CENTER
NPS HOME
|
|
|
|
Annual Report 1995
Research, Inventory, and Monitoring
Mineral King Risk Reduction Project
Anthony C. Caprio (compiler)
Data Coordinator & Fire Ecologist
Science and Natural Resources Division
Sequoia and Kings Canyon National Parks
Three Rivers, CA 93271-9700
June 7, 1996
The Executive Summary of the 1996 Mineral
King Risk Reduction Project Annual Report is available in HTML
format. The entire report is available in Adobe Acrobat PDF format.
To view these files you will need a free Acrobat Reader. If you
do not have one, you can download it from Adobe here.
The report is divided into multiple sections for faster downloading.
Report Cover (134 K)
Section 1 (1.8 MB)
|
| Page
|
Executive Summary | 3
|
I) Project Year Synopsis:
|
Accomplishments for Each 1995 Project and Goals for 1996
| 4 |
II) Overview of Project |
| 6 |
B) Description - East Fork Project Area
| 8 |
Section 2 (773 kb)
|
III) Project Year 1995 | 12
|
| 15 |
| 15 |
2) Giant Sequoia Fire Scars and Fuel Loading
| 17 |
3) Natural Resource Inventory (NRI)
| 18 |
| 19 |
| 23 |
1) Watershed: Stream Chemistry and Stream Hydrology
| 23 |
2) Watershed: Aquatic Biota Survey
| 26 |
Section 3 (303 kb)
|
D) Fuels Inventory and Monitoring
| 27 |
| 32 |
F) Economic/Social Modeling
| 34 |
| 34 |
IV) References | 36
|
V) Appendices | 38
|
1) Study Plan: Prescribed Fire and Heavy Fuel Effects on Mature Giant Sequoia Trees
| 39 |
2) Report on: Fire Effects Monitoring on Wildlife
| 47 |
|