Awarded Contracts

AZ | CA | CO | HI | ID | KS | NE | NV | NM | ND | OK | SD | TX | UT | WY

AZ PRA GRCA 15(1) & 12(3), Hermit Road & South Entrane Road

Awarded to:  Fann Contracting, Inc (928-778-0170)

Contract Amount:  $11,665,027.50 (Schedule A & Options X and Y)

Date of Award:  12/17/07

AZ/NV HPP 93(4), Hoover Dam Bypass Interim Surfacing

Awarded to:  Las Vegas Paving Corporation (702-251-5800)

Contract Amount:  $6,505,066.50 (Schedule A & Options X and Y)

Date of Award:  12/06/07

AZ PRA FLAG 10(2), Sunset Crater-Wupatki Loop Road

Awarded to:  Fann Contracting, Inc. (928-778-0170)

Contract Amount:  $6,867,377.00 (Schedule A & Option X)

Date of Award:  12/27/06

AZ PFH 43-1(2), Sunrise Park-Big Lake Road

Awarded to:  FANN Contracting, Inc.  928-778-0170

Contract Amount:  $15,523,539.00

Date of Award:  6/26/06

AZ PRA SAGU 500(1) & 100(1), Cactus Forest Drive

Awarded to:  Granite Construction  Schedule B

Contract Amount:  $ 2,025,893.00

Date of Award:  4/18/06

AZ PFH 43-1(1), Sunrise Park - Big Lake Road

No bids received.   No award will be made as solicited.

AZ-NV HPP 93(3), Hoover Dam Bypass Colorado River Bridge

Awarded to:  Obayashi Corporation/PSM Construction USA, Inc.

A Joint Venture (650-952-4910)

Contract Amount:  $114,000,000.00

Date of Award:  10/22/04


CA ERFO 13(1), Six Rivers Orleans

Awarded to:  Hard Rock Construction (530-695-3100)

Contract Amount:  $2,482,371.00

Date of Award:  June 9, 2008

CA ERFO 82(2),  Klamath-Elk Creek Road

Awarded to: Oregon Mt. Constructors, Inc. (530-224-1337)

Contract Amount:  $767,660.00

Date of Award:  May 30, 2008

CA ERFO 102(1), Sawyers Bar Road

Awarded to Hayes & Sons, Inc. (530-493-2679)

Contract Amount:  $1,237,500.00

Date of Award:  May 30, 2008

CA ERFO 4(1), 6(1), Six Rivers - Lower Trinity

Awarded to R. Brown Construction Company, Inc (530-629-3702)

Contract Amount:  $732,021.50

Date of Award:  May 27, 2008

CA PFH 114-1(1), Hyampom Road

Awarded to Steve Manning Construction (530-222-0810)

Contract Amount:  $16,995,397.80

Date of Award:  May 19, 2008

CA ERFO 1(1) Los Padres 2005 Various Routes

Awarded to: Jurin Construction, Inc. ((530) 629-4534)

Contract Amount: $1,226,636.00

Date of Award: September 13, 2007

CA PRA YOSE 16(2), El Portal Road

Awarded to:  Emmett's Excavation, Inc (559-299-1256)

Contract Amount:  $8,748,620.00

Date of Award:  September 12, 2007

CA ERFO 8(1), Old Ridge Route

Awarded to: K.C. Equipment, Inc., (619) 443-9730)

Contract Amount: $945,777.00

Date of Award: September 12, 2007

CA ERFO 5(1), Los Padres 2005 Santa Ynez

Awarded to:  CKY, Incorporated (310-519-4000)

Contract Amount:  $734,500.00

Date of Award:  September 6, 2007

CA PRA 102(1), Crescent Meadow Road, Morro Rock Loop,

and Parking Areas - Sequoia Kings Canyon National Park

Awarded to: Construction Development Systems (559-251-3425)

Contract Amount:  $2,388,520.00

Date of Award:  August 22, 2007

CA PRA YOSE 13(4), Big Oak Flat Road

Awarded to:  Intermountain Slurry Seal, Inc. (831-724-1011)

Contract Amount:  $1,986,451.40

Date of Award:  August 16, 2007

CA PFH 116-1(1), Trinity Mountain Road

Awarded to:  Eagle Peak Rock & Paving, Inc. (530-233-4568)

Contract Amount:  $4,292,676.00

Date of Award:  July 24, 2007

CA PRAJOTR 13(1), Keys View Road

Awarded to:  Vance Corporation (909-355-4333)

Contract Amount:  $7,688.699.10

Date of Award: February 26 , 2007

CA PRA LAVO 10(2), Lassen Park Road

Awarded to:  Steve Manning Construction, Inc. (530-222-0810)

Contract Amount:  $9,878,548.50

Date of Award: January 30, 2007

CA PFH 81-1(1), Lake Mary Road

Awarded to:  Carlson Construction Company (775-782-2006)

Contract Amount:  $4,551,024.00

Date of Award:  November 7, 2006

CA PFH 149-1(2a), Mad River Road Slide Repair

Awarded to:  Mercer Fraser Company (707-443-6371)

Contract Amount:  $1,969,485.00

Date of Award:  September 19, 2006

CA PRA YOSE 500(1), Valley Loop Road

Awarded to:  George Reed, Inc.

Contract Amount:  $14,711,407.20

Date of Award:  September 8, 2006

CA PRA SEKI 10(6R), Generals Highway Sequoia

Awarded to:  AGEE Construction Corporation (559-299-3290)

Contract Amount:  $ 11,539,438.00 Schedule A

Date of Award:  June 13, 2006

CA PFH 119-1(4), Oroville-Quincy

Awarded to:  Mercer-Fraser Company (707-433-6371)

Contract Amount:  $15,494,923.75

Date of Award:  January 10, 2006

CA PRA DEVA 10(2), Death Valley National Park

Awarded to:  Mercer Fraser Company (707-443-6371)

Contract Amount:  $ 6,477,325.80

Date of Award: August 4, 2005

CA PFH 93-1(2), Cecilviile-Callahan

Awarded to:  Mercer Fraser Company (707-443-6371)

Contract Amount:  $ 5,263,388.00

Date of Award: May 4, 2005

 

CA PFH 24-2(1), Gold Lake Road

Awarded to:  Eagle Peak Rock & Paving (530-233-4568)

Contract Amount:  $5,062,897.00

Date of Award:  May 4, 2005

CA PRA YOSE 14(3) & 16(5), Merced River Bridge/El Portal Road

Awarded to:  American Civil Constructors - West Coast  (707-746-8028)

Contract Amount:  $5,279,287.50

Date of Award:  03/18/05

CA PFH 120-1(3), Quincy-LaPorte Road

Awarded to:  DD-M/Nova, A Joint Venture  (510-769-8707)

Contract Amount:  $3,898,324.00

Date of Award:  08/05/04

CA RRP DOED 10(1), Marshlands Road - Don Edwards SF Bay NWR

Awarded to:  RGW Construction, Inc.  (925-606-2400)

Contract Amount:  $1,161,904.00

Date of Award:  07/26/04

CA PFH 93-1(1), Cecilville-Callahan

Awarded to:  Mercer, Fraser Company  (707-443-6371)

Contract Amount:  $4,298,946.00

Date of Award:  05/19/04

CA ERFO/PRA SEQU 10(7), Generals Highway-Sequoia Kings Canyon

Awarded to:  Stimpel-Wiebelhaus Associates (530-223-6605)

Contract Amount:  $1,981,104.00

Date of Award:  01/16/04

CA PRA YOSE 14(2), South Fork Merced River Bridge/CA PRA YOSE 16(4), El Portal Road Micro-Surfacing - Yosemite National Park

Awarded to:  Mitchell Engineering (415-227-1040)

Pier 26 The Embarcadero

San Francisco, CA 94105

Date of Award:  12/18/03

CA PFH 119-2(3), Oroville-Quincy Highway, Plumas National Forest
Awarded to: Viking/Stimpel A Joint Venture (530-223-6605)
Contract Amount: $6,926,739.00
Date of Award: 11/26/03

CA PFH 149-1(2), Mad River Road, Shasta-Trinity National Forests
Awarded to: Tidewater Contractors, Inc. (541-469-5341)
Contract Amount: $11,435,825.00
Date of Award: 11/26/03

 


CO IMR-PRES 1(08), Canyonlands National Park (Pavement Preservation)

Awarded to:  Intermountain Slurry Seal, Inc. (831-724-1011)

Contract Amount: $5,237,960.00

Date of Award:  08/05/08

CO PFH 80-2(3), Guanella Pass Road

Awarded to:  SEMA Construction, Inc. (303-627-2600)

Contract Amount:  $31,547,589.30

Date of Award:  06/13/2008

CO RRP ROMO 103(1), Lower Derby Lake Road

Awarded to: JE Hurley Construction, Inc (719-265-8668)

Contract Amount:  $729,777.60

Date of Award:  05/13/2008

CO PFH 16-1(2), Marvine-Yampa

Awarded to: American Civil Constructors, Inc (303-730-4534)

Contract Amount:  1,859,495.00

Date of Award:  11/20/2007

CO PRA MEVE 10(8) & 200(1), Chapin Mesa & Wetherill Mesa Roads

Awarded to:  Kirkland Construction LLLP (719-489-3385)

Contract Amount:  14,449,357.00

Date of Award:  04/06/2007

CO PRA ROMO 10(4), Trail Ridge Road

Awarded to:  Kiewet Western Company (303-979-9330)

Contract Amount:  $10,193,005.00

Date of Award:  12/12/2006

CO RRP BRPA 10(1) Browns Park NWR Wildlife Drive

Awarded to : Creative Times, Inc (719-278-0901)

Contract Amount: $1,999,270.00

Date of Award: 08/16/2006

CO PFH 81-1(2), Tarryall Creek Road

Awarded to:  American Civil Constructors (303-795-2582)

Contract Amount:  $10,524,265.20

Date of Award:  05/25/06

CO PRA COLM 10(1), Rim Rock Drive

Awarded to:  Kiewit Western Company (303-979-9330)

Contract Amount:  $8,334,605.00

Date of Award:  05/09/06

CO PRA GRSA 10(1), Entrance Road (Great Sand Dunes)

Awarded to:  Asphalt Constructors, Inc. (719-589-6671)

Contract Amount:  $2,922,456.00

Date of Award:  04/10/06

CO PFH 16-1(1), Marvine Phippsburg

Awarded to:  RB Constructors, LLC (208-656-9404)

Contract Amount:  $4.047,300.00

Date of Award:  03/16/05

CO OM-AD 300(50), Minuteman Missile Access Roads

Awarded to:  Pine Bluffs Gravel & Excavating

Contract Amount:  $578,368.00

Date of Award:  07/28/04

CO PRA CURE 10(2), Lake Fork, Elk Creek & Iola (Curecanti)

Awarded to:  Oldcastle SW Group, Inc. dba United Companies of Mesa          County (970-243-4900)

Contract Award Amount:  $3,927,418.00

Date of Award:  04/21/06

CO PRA MEVE 10(7), Main Entrance Road, Mesa Verde National Park

Awarded to:  Kirkland Construction, LLP (719-489-3385)

Contract Amount:  $5,077,350.00

Date of Award:  04/08/04

CO PFH 80-1(1) & 2(2), Guanella Pass Road including 7th St. Bridge

Awarded to:  American Civil Constructors, Inc.  (303-795-2582)

Contract Amount:  $20,114,704.40

Date of Award:  01/08/04


HI STP/PLH KEPO 10(3), Kealia Pond

Awarded to:  Jennings Pacific LLC (808) 537-1710

Contract Amount:  $747,261.50

Date of Award: 10/21/08

HI A-AD 6(4), State Route 200, Saddle Road

Awarded to:  Goodfellow Brothers, Inc. (808) 887-6522

Contract Amount:  $9,278,727.00

Date of Award:  10/25/07

HI A-AD/STP 6(3), Saddle Road & 200(1) Pohakuloa Training Area

Awarded to:  Goodfellow Brothers, Inc. (808) 879-5205

Contract Amount:  $59,070,941.68

Date of Award:  05/03/06

HI PLH SR 11-1(1), Volcano Highway

Awarded to:  Isemoto Contracting Co., Ltd.  (808) 935-7194

Contract Amount:  $2,734,595.50

Date of Award:  06/03/05

HI RRP/FWS, HAFO 10(1), Keanakolu Road/Hakalau National Forest

Awarded to:  Willocks Construction Corp.  (808) 982-9099

Contract Amount:  $1,228,302.00

Date of Award:  5/27/05

HI 6(2), & EMP 6(1A), Saddle Road & Palila Mitigation Site Fencing

Awarded to:  Kiewit Pacific Company (808) 674-1088

Contract Amount:  $9,986,824.00

Date of Award:  03/31/05

HI A-AD 6(1), Saddle Road

Awarded to:  Kiewit Pacific Company (808) 674-1088

Contract Amount:  $11,123,862.00

Date of Award:  01/09/04


NO CONTRACTS AWARDED FOR THE STATE OF IDAHO


NO CONTRACTS AWARDED FOR THE STATE OF KANSAS


NE OMAD 36(36), CO OMAD 300(52) & WY OMAD 301(49), Minuteman Missile Access Roads

Awarded to:  KSK Contracting, Inc.

Contract Amount:  $1,640,376.00

Awarded Schedule A & Option 1

Date of Award:  06/05/07

 

NE OMAD 36(35) & CO OMAD 300(51), Minuteman Missile Access Rds

Awarded to:  Federal Services, Inc. (701) 265-8262

Contract Amount:  $1,768,980.00

Awarded Schedule A, Option 1, Option 2 and Option 3

Date of Award:  05/04/06

NE OM-AD 36(34), Minuteman Missile Access Roads

Awarded to:  Pine Bluffs Gravel & Excavating, Inc.  (307) 245-3426

Contract Amount:  $1,721,858.64

Date of Award:  06/08/05

 

NE OM-AD 36(33), Minuteman Missile Access Roads

Awarded to:  S & L Industrial

Contract Amount:  $898,630.00

Date of Award:  07/27/04



NV PRA LAME 1(8), Northshore Road

Awarded to:  Frehner Construction Company (702-649-2530)

Contract Amount:  $10,725,159.88 (Schedule A)

Date of Award: 08/21/2008

NV/AZ HPP 93(4), Hoover Dam Bypass Interim Surfacing

Awarded to:  Las Vegas Paving Corporation (702-251-5800)

Contract Amount:  $6,505,066.50 (Schedule A & Options X and Y)

Date of Award:  12/06/07

NV ERFO 103(1), Virgin Valley Road

Awarded to:  Eagle Peak Rock & Paving, Inc.(530-233-4568)

Contract Amount:  $502,165.00

Date of Award:  9/10/07

NV PRA LAME 1(6), 1(7) & 2(1), Northshore Road and Lake Mead Blvd.

Awarded to:  Frehner Construction Company (702-253-0919)

Contract Amount:  $13,906,507.90

Date of Award:  12/21/05

NV-AZ HPP 93(3), Hoover Dam Bypass Colorado River Bridge

Awarded to:  Obayashi Corporation/PSM Construction USA, Inc.

A Joint Venture (650-952-4910)

Contract Amount:  $114,000,000.00

Date of Award:  10/22/04


NM ERFO 82(2), Gilita Creek Road

Awarded to:  S & L Industrial (307) 549-2242

Contract Amount:  $1,395,820.00

Date of Award:  07/01/08

NM PFH 12-1(7), CUBA-LACUEVA

Awarded to:  Mountain States Constructors, Inc. (505) 292-0108

Contract Amount:  $5,632,635.00

Date of Award:  09/21/07

NM PFH 12-1(6), CUBA-LACUEVA

Awarded to:  Twin Mountain Construction II Company (505) 884-9715

Contract Amount:  $10,400,000

Date of Award:  08/31/06

NM PRA BAND 10(1), Bandelier National Monument

Awarded to:  Twin Mountain Construction II Company (505) 884-9715

Contract Amount:  $1,573,151.60

Date of Award:  07/19/04

NM PRH 45-1(5), Sacramento River Road

Awarded to:  Delhur Industries, Inc. (360) 457-1133

Contract Amount:  $10,158,250.12

Date of Award:  12/03/03


ND PRA THRO 10(4), North Unit Spot Repai, Theodore Roosevelt NP

Awarded to:  Bituminous Paving, Inc (320-273-2113)

Contract Amount:  $1,313,994.50 (Schedule C)

Date of Award:  06/18/08

 

ND RRP UPSO 11(1), Prairie Marsh Scenic Drive

Awarded to:  TEK Industries (701-290-2841)

Contract Amount:  $1,659,745.60

Date of Award:  05/16/06

Date of Award:  07/20/04

ND PRA THRO 11(4), South Loop Road, Theodore Roosevelt NP

Awarded to:  Northern Improvement Company (701-277-1225)

Contract Amount:  $6,437,171.00


OK PRA CHICK 10(2)ETAL, Perimeter Road, Veterans Lake Dam, Veterans Lake Picnic & Trails, Chickasaw Recreation Area

Awarded to: Seal Masters, Inc/PSI (580) 369-2393

Contract Amount:  $ 1,152,750.00

Date of Award: 09/06/2007

 


SD PFH 27-1(1), Iron Creek - Spearfish Road, Black Hills National Forest

Awarded to: Bituminous Paving, Inc (320-273-2113)

Contract Amount:  $ 3,580,146.93

Date of Award:  04/11/07

SD RRP LAAN 101(1), North and South Dike Road

Awarded to:  Doug O'Bryan Contracting, Inc.

Contract Amount:  $1,378,132.60

Date of Award:  09/05/07


TX RRP BRAZ 10(2), Brazoria Tour Loop Road

Awarded to:  MAPCO, Inc.

Contract Amount:  $1,684,201.00

Date of Award:  01/18/07

 

TX PRA BIBE 16(4) & 109(1), Castolon to Santa Elena

Awarded to:  Gilbert Texas Construction, L.P.

Contract Amount:  $2,074,604.86

Date of Award:  06/09/05

 

TX RRP/FWS ANAH 10(1), Anahuac Entrance Road and Bridge Replacement
Awarded to: W.T. Byler Company, LP 281-445-2070
Contract Amount: $3,549,665.75
Date of Award: 05/26/05

TX FWS HAGE 10(1), Hagerman National Wildlife Refuge(Schedule A)

Awarded to:  North Texas Bridge Company, Inc. (972-509-1359)

Contract Amount:  $1,689,608.90

Date of Award:  04/30/04


UT PLH 523-1(1), Bear River Access Road

Awarded to: Staker & Parson Companies

Contract Amount: $6,338,246.60 (Schedule C, Options X, Y, & Z)

Date of Award:06/19/2008

UT PFH 39-1(2), Sevenmile-Gooseberry Rd, Phase II

Awarded to: RAM Constructors, Inc (801-225-7662)

Contract Amount: $8,610,513.00

Date of Award: 01/14/2008

UT PRA CARE 227(1), Burr Trail Road

Awarded to:  Brown Brothers Construction Company

Contract Amount:  $622,602.47

Date of Award:  08/22/07

UT PFH 46-1(1), Mill Creek Bridge Replacement

Awarded to:  Adams & Smith, Inc.

Contract Amount:  $868,614.56

Date of Award:  03/14/07

UT PFH 8-1(1), Ephraim-Orangeville

Awarded to:  Brown Brothers Construction CO. (435-836-2685)

Contract Amount:  $787,682.50

Date of Award:  05/04/06

 

 

UT PRA GLCA 7(1), Halls Crossing Road

Awarded to: LeGrand Johnson Construction Company (435-752-2000)

Contract Amount:  $3,763,536.00 (Schedule A only)

Date of Award:  03/06/06

UT PRA DINO 10(2) & 100(1), Cub Creek & Quarry Access

Awarded to:  Burdick Paving (435-722-5013)

Contract Amount:  $ 2,467,890.75  (includes Schedule A and Option Y)

Date of Award:  07/15/05

UT PFH 39-1(1a), Sevenmile-Gooseberry Phase 1 Paving

Awarded to:  Hales Sand & Gravel, Inc. (435-529-7434)

Contract Amount:  $2,805,600.50

Date of Award:  06/22/05

UT PRA ZION 10(3) & 11(2), Zion Canyon Scenic Drive

Awarded to:  Interstate Rock Products, Inc.  (435-635-2628)

Contract Amount:  $2,891,828.90

Awarded Schedule A, Option Y and Modified Contract to Include Option Z

Date of Award:  04/15/05


WY PFH 23-1(2), Louis Lake Road

Awarded to:  High Country Construction, Inc. (307-332-4933)

Contract Amount:  $12,934,960.42

Date of Award:  08/19/05

WY HPP 4-1(4), Beartooth Highway 

SOLICITATION CANCELLED

No award will be made as solicited.  A new solicitation will be repackaged

at a later date.  No other information is available at this time.

WY HPP 4-1(3B), Beartooth Clearing Contract

S&L Industrial (307-548-2242)

Contract Amount:  $302,988.00

Date of Award:  08/02/04

WY RRP SEED 12(1), Seedskadee National Wildlife Refuge

Desert Sage Contractors, Inc. (208-552-1144)

Contract Amount:  $520,999.00

Date of Award:  5/11/04

 

 

Top of Page