30 CFR § 75.200
Scope.
This Subpart C sets forth requirements for controlling roof, face and ribs,
including coal or rock bursts, in underground coal mines. Roof control
systems installed prior to the effective date of this subpart are not
affected so long as the support system continues to effectively control the
roof, face and ribs.
|