Bulletin No. 107. Guidelines for: Suggested Safety and Operating Procedures When Making Ammonia Refrigeration Plant Tie-Ins. IIAR (1997, February),
7 pages. This bulletin addresses the need to approach ammonia refrigeration system tie-ins in a safe and methodical manner. It
provides owners and contractors with a general checklist of safety and logistical items that should be reviewed when planning system shutdowns and tie-ins. Equally important, it provides engineers with ideas on how and where to design for future connections and taps that can make future
tie-ins easier and safer.
TABLE OF CONTENTS
- 1. Introduction
- 2. Scope
- 3. Reference Sources
- 4. Planning for Future Expansion
- 5. Planning Individual Load Additions
- 6. Pumping Out Prior to Tie-In
- 7. Tie-In
- 8. Testing
- 9. Bring On-Line
|