Department of Labor Seal photos representing the workforce - digital imagery© copyright 2001 photodisc, inc.
Department of Labor Seal www.osha.gov   [skip navigational links] Search    Advanced Search | A-Z Index
eTools Home : Shipyard Employment Scope | Glossary | Additional Resources | Viewing / Printing Instructions | Credits
Shipyard Employment eTool: Shipbreaking
General Requirements Shipbuilding Ship Repair Shipbreaking Barge Cleaning

Shipyard Employment ยป Shipbreaking
 
Shipbreaking is the process of dismantling an obsolete vessel's structure for scrapping or disposal. Conducted at a pier, drydock, or dismantling slip, it includes a wide range of activities, from removing all gear and equipment to cutting down and recycling the ship's structure. The structural complexity of ships makes shipbreaking a challenging process. It involves many safety, health and environmental issues. [Applicable 1915 Shipbreaking Standards]
Survey and Pre-Planning Survey and Pre-Planning Removing Hazardous Material Removing Hazardous Material Salvaging Equipment and Valuable Materials Salvaging Equipment and Valuable Materials Scrapping Scrapping Shipbreaking Illustration

A demolition plan is often used to systematically scrap the vessel and to ensure the safety and health of the workers. A demolition plan involves the following steps:
  
Shipbreaking Processes
1. Survey and Pre-Planning
Includes identifying hazardous materials and determining work processes:
Survey and Pre-Planning
Figure 1: Illustration of Shipbreaking survey.
2. Removing Hazardous Material
Includes removing items included in the inventory of hazardous materials (such as fuel and cargo residues, insulating materials, preservatives, and paints): 
Removing Hazardous Material
Figure 2: Ship's piping coated
with asbestos.
3. Salvaging Equipment and Valuable Materials
Includes removing items such as machinery, equipment, electronics, wiring, piping, furnishings, and non-ferrous metals:
Salvaging Equipment and Valuable Materials
Figure 3: Illustration of worker salvaging equipment.
4. Scrapping
Includes cutting and removing the hull and other structures of the vessel:
Scrapping
Figure 4: Illustration of worker scrapping ship.


The Fire Protection in Shipyard Employment Standard (29 CFR 1915 Subpart P) was issued September 15, 2004 and became effective December 14, 2004. The new Fire Protection module has been added to address these changes. In addition, it is anticipated the Ship Repair, Shipbuilding and Shipbreaking eTool modules will be modified in the near future to address this new Shipyard fire protection standard.

 

eTools Home : Shipyard Employment Scope | Glossary | Additional Resources | Viewing / Printing Instructions | Credits

Back to Top Back to Top www.osha.gov www.dol.gov

Contact Us | Freedom of Information Act | Customer Survey
Privacy and Security Statement | Disclaimers
Occupational Safety & Health Administration
200 Constitution Avenue, NW
Washington, DC 20210