|
Industrial
Impact Evaluation of a Refrigeration Control System installed at Columbia Colstor, PNL 9463, UC-310 (1/96)
Impact Evaluation of an Improved Wastewater Aeration System Installed at Boise Cascade, PNL 9966, UC-310 - forthcoming
Impact Evaluation of a Water Flow Improvements Project Installed at Fiberweb North America, Inc.; PNL 9453, UC-310 (8/95)
Impact Evaluation of Energy Conservation Measures Installed at Mayr Brothers Logging Company; PNL 9462, UC-310 (5/95).
Impact Evaluation of a Refrigeration Control System Installed at Vitamilk Dairy, Inc.; PNL 8915, UC-310 (1/95)
Impact Evaluation of a Mill Tailings Thickener Installed at J.R. Simplot Company, Smoky Canyon Mining, PNL 9344 UC-310 (1/95)
Impact Evaluation of a Slush Chest Bypass Installed at Scott Paper Company; PNL 9466, UC-310 (2/95)
Impact Evaluation of an Induction Furnace Replacement at Mackenzie Specialty Castings, Inc. M.A. Oens and G.E. Spanner, Pacific Northwest Laboratory. PNL- 9057/UC-310 (4/94)
Impact Evaluation of Lighting Retrofit Projects at Boeing Commercial Airplane Group. G.P. Sullivan, M.A. Oens, G.E. Spanner. PNL-8834/UC-310 PNL (1/94)
Impact Evaluation of Adjustable Speed Drives Installed at Great Western Malting Company. DR. Brown and G.E. Spanner. PNL-8879/UC 310. PNL (1/94)
Impact Evaluation of a Refrigeration Control System Installed at Darigold, Incorporated under the Energy Savings Plan Program. D.R. Brown and G.E. Spanner, PNL-8254. (9/93)
Impact Evaluation of Adjustable Speed Drives Installed at Hewlett-Packard Company under the Energy Savings Plan Program. G. Sullivan, K. Daellenback, and G.E. Spanner, PNL-8661/UC-310 9 (9/93)
An Overall Assessment of the Energy Savings Plan Program Completed to Date (1989-1992). G.E. Spanner, D. Brown, Pacific Northwest Laboratory. PNL-8446. UC-310 (5/93)
Impact Evaluation of a Variable Speed Drive Project at Ball-Incon Glass Packaging Corp. under the Energy Savings Plan Program, PNL-8484/UC-310 (5/93)
Impact Evaluation of the Electronic Power Controls Project at Holnam Incorporated, under the Energy Savings Plan Program - PNL-8483/UC-310 (5/93)
Impact Evaluation of an Induction Furnace Replacement at Sather Manufacturing under the Energy Savings Plan Project. PNL-8426/UC-310. Pacific NW Laboratory (12/92)
Impact Evaluation of a Compressor Valve Enhancement Project at Elf Atochem North America under the Energy Savings Plan Project. D.R. Brown and G.E. Spanner. PNW Laboratory. PNL-8225/UC-310. (8/92)
Impact Evaluation of a Compressor Valve Enhancement Project under the ESP Project at ARCO Petroleum Products Company. D. Dixon, G. Spanner and G. Sullivan. Pacific Northwest Laboratory. PNL-8164/UC-310. (8/92)
Impact Evaluation of a Nitrogen Feed Compressor Replacement at the Union Carbide Corporation, Linde Division under the Energy Savings Plan Project. G.E. Spanner and G. Sullivan. Pacific Northwest Laboratory. PNL-8017/UC-310 (4/92)
Impact Evaluation of a Heat Exchanger Project at Lenroc Company/Moorman Manufacturing under the Energy Savings Plan Project. G.E. Spanner and G. Sullivan. Pacific Northwest Laboratory. PNL-7920/UC-310. (2/92)
Impact Evaluation of an Energy Savings Plan Project at Columbia Harbor Lumber Company. G.E. Spanner and G. Sullivan. Pacific Northwest Laboratory. PNL-7919/UC-310. (2/92)
Process Evaluation of the Redesign of the Energy Savings Plan (E$P) Program. J. Jennings and D. Barry, ERC International for Pacific Northwest Laboratory. PNL-7852. (10/91)
Staying Power (a.k.a. Business Closures) Impact Evaluation. M. Kellogg, ERCE Demand Side Management Services. ERCE/DSM-72. (8/91)
Impact Evaluation of an Energy Savings Plan Project at Georgia Pacific. G. E. Spanner and D. Dixon. Pacific Northwest Laboratory. PNL-7491/UC-310. (2/91)
Process Evaluation of the Power ADDvantage Program. D. Barry, J. Peters, J. Jennings. ERCE, Inc. ERCE/PO-57. (8/90)
Impact Evaluation of an Energy Savings Plan Project at ITT Rayonier. G.E. Spanner and D. Dixon. Pacific Northwest Laboratory. PNL (8/90).
Impact Evaluation of an Energy Savings Plan Project at Bellingham Cold Storage. G.E. Spanner. Pacific Northwest Laboratory. PNL-7237/UC-310. (6/90)
Impact Evaluation of an Energy Savings Plan Project at Lamb Weston. G.E. Spanner and G. Wilfert. Pacific Northwest Laboratory. PNL-7316/UC-310. (4/90)
Process Evaluation of the Partnership Business Closure Program: Final Report. J. Peters. ERC International. ERCE/PO-53. (3/90)
Process Evaluation of the Sponsor-Designed Program: The Refrigeration Retrofit Program for the Food Processing Industry. Final Report. J. Peters and P. Seratt. ERC International. ERCE/PO-55. (1/90)
Follow-up Process Evaluation of BPA's Energy Savings Plan Program. J. Jennings, J. Peters, ERC International. PNL-7202/UC-000. (1/90)
Process Evaluation of the Sponsor-Designed Program: The Refrigeration Retrofit Program for the Food Processing Industry. 1988 Annual Report. J. Peters, ERC International. ERC/PO-40. (3/89)
Interim Process Evaluation of BPA's Energy Savings Plan Program. J. Peters, ERC International. (3/89)
Impact Evaluation of an Energy Savings Plan Project at Gorge Energy Division of SDS Lumber. G.E. Spanner and D. Dixon. Pacific Northwest Laboratory. PNL-6901. (1/89)
Potential Techniques for Evaluating the Impact of Industrial Energy Conservation Projects under Bonneville's Energy Savings Plan: Letter Report. G.E. Spanner, D.R. Brown, D.R. Dixon, B.A. Garrett, R.W. Reilly, J.M. Roop, S.A. Weakley. Pacific Northwest Laboratory. (6/88).
Industrial Lighting Incentive Program Process Evaluation. Portland Energy Conservation, Inc. (5/88).
Aluminum Smelter Conservation/Modernization Section 6(c) Process Evaluation. Booz-Allen & Hamilton. (4/88).
Interim Report Process Evaluation of the Sponsor-Designed Program: The Refrigeration Retrofit Program for the Food Processing Industry. ERC International. IEAL/PO-25. (2/88)
Process Evaluation of the Sponsor-Designed Site Specific Program. J. Peters and G. Gustafson, IEAL. IEAL/PO-10. (3/87)
Process Evaluation of the Industrial Test Program: Final Report. G. Gustafson and J. Peters, IEAL. IEAL/PO-15. (2/87)
Summary Report: Non-Response Evaluation of Site-Specific Sponsor Designed Program Focus Groups. J. Peters and G. Gustafson, IEAL. IEAL/PO-7. (9/86)
Process Evaluation of the Industrial Test Program: Interim Report. G. Gustafson, B. Bronfman, and D. Lerman, IEAL. IEAL/PO-5. (8/86)
Go To Top of Page
|
|
|