LeRoy Cain, Pre-Flight Mission Management Team Chairman Cain is the manager of Space Shuttle Launch Integration. He shares mission management team responsibilities with John Shannon, who acts as In-Flight Mission Management Team Chairman. Cain reports directly to Space Shuttle Program Manager Wayne Hale and assists with the overall management, integration and operations of the Space Shuttle Program. |
|
|
Mike Leinbach, Launch Director Leinbach polls the payload manager, the shuttle engineering director, the cape weather officer and the director of safety to get a launch consensus and verifies that the NASA test and mission management team directors are in agreement. The launch director is responsible for making the final "go/no-go" decision to proceed with the launch. |
|
|
Jeff Spaulding, NASA Test Director Spaulding is the leader of the shuttle test team responsible for directing and integrating all flight crew, orbiter, external tank/solid rocket booster and ground support testing throughout the shuttle launch countdown. The test director also is responsible for the safety of all personnel inside the pad after external tank loading, including the flight crew. He reports to the launch director. |
|
|
Scott Higginbotham, International Space Station Mission Manager The International Space Station mission manager leads the team of engineers and technicians that assemble and test the station experiments and hardware that are flying on mission STS-118. Higginbotham is the primary interface with the payload customers and is responsible for solving any technical issues that may arise with any of the station hardware. |
|
|
Tassos Abadiotakis, NASA Flow Manager Abadiotakis, the NASA Flow Manager for Space Shuttle Endeavour, is responsible for the integration, scheduling and conduct of the orbiter's processing operations and launch countdown. |
|
Kathy Winters, Launch Weather Officer The launch weather officer, located at the Range Operations Control Center on Cape Canaveral Air Force Station, evaluates range and shuttle weather launch commit criteria. Winters is in constant contact with the launch director and landing recovery director during the countdown, and is polled by the launch director during the final launch poll. |
||
|
Steve Payne, Assistant NASA Test Director Payne is responsible for management of the launch team and launch procedure for the terminal countdown through his support of the NASA test director. The test director's special duties include management of the countdown clock with the ground launch sequencer operator, and management of any special crews sent to the pad for major issues or emergencies. |
|
|
Shannon Bartell, Director of Safety and Mission Assurance As director of safety and mission assurance, Bartell is the advisory member to the mission management team. In this capacity, she is responsible for reviewing the rationale in decision-making, for ensuring that dissenting opinions are encouraged, and for calling on additional resources to respond to short turnaround issues. |
|
|
Charlie Abner, Chief Engineer The chief engineer is responsible for all engineering aspects related to processing flight hardware elements and facility/ground support equipment and for the integration of technical decisions made by both engineering and management personnel before and during launch. He makes recommendations for final "go/no-go" launch decisions. |
|