Phase 1 Final Design Report Hudson River PCBs Superfund Site (March 21, 2006)
Phase 1 Final Design Report [ PDF 1.7 MB, 103 pages ]
Attachments:
- Attachment A [ PDF 1.4 MB, 174 pages ] – Addendum to Treatability Studies Report
- Attachment B [ PDF 3.9 MB, 105 pages ] – Year 2 Supplemental Engineering Data Collection Data Summary Report
- Attachment C [ PDF 266 KB, 15 pages ] – Geotechnical Investigation Summary Report
- Attachment D [ PDF 298 KB, 18 pages ] – Logistics Model Summary
- Attachment E [ PDF 373 KB, 30 pages ] – Adjustment of the Dredging Surface to Account for Cores with Depths of Contamination Different than the Dredging Surface
- Attachment F [ PDF 9.9 MB, 106 pages ] – Phase 1 Final Design Report Dredge Resuspension Modeling
- Attachment G [ PDF 69 KB, 13 pages ] – Assessment of Flow Necessary in the East Channel of the Hudson River at Rogers Island to Meet Water Quality Standards
- Attachment H [ PDF 4.2 MB, 68 pages ] – Phase 1 Adaptive Management Plan
- Attachment I [ PDF 3.2 MB, 103 pages ] – Air Quality Modeling Methodology and Results
- Attachment J [ PDF 4.5 MB, 56 pages ] – Noise Impact Assessment
- Attachment K [ PDF 490 KB, 4 pages ] – Checklist
Community Health and Safety Plan (RA CHASP) [ PDF 2.6 MB, 119 pages ]
The RA CHASP addresses potential community health and safety issues for the public in the vicinity of the Phase 1 of the Hudson River dredging project. The RA CHASP describes potential hazards and impacts to members of the local community, and the steps that will be taken to prevent and respond to them. It also sets forth a Community Education and Notification Plan for providing the public with timely and accurate information about project work activities and schedule, and a Complaint Management Program for the public to register project-related complaints
Environmental Monitoring Plan [ PDF 913 KB, 78 pages ]
To gauge the effectiveness of dredging, sediment processing, water treatment, and other aspects of the Phase 1 work relative to performance standards and water quality requirements, an extensive environmental monitoring program has been designed. The Phase 1 Environmental Monitoring Plan provides details of all the monitoring activities and associated contingency and mitigation plans for the performance standards and water quality requirements.
How to Submit Comments:
EPA has initiated a thorough review of the Final Design Report and Community Health and Safety Plan and is soliciting input from the public through May 24, 2006. Hard copies of the Intermediate Design Report are available at information repositories in Glens Falls, Fort Edward (EPA Hudson River Field Office), Ballston Spa, Albany, Poughkeepsie, New York City (EPA Region 2 offices), and Edgewater, New Jersey.
Submit Comments By Close of Business May 24, 2006 To:
Dave King, Director
Hudson River Field Office
421 Lower Main Street
Hudson Falls, NY 12839
king.david@epa.gov
(518) 747-4389
(866) 615-6490 (Toll Free)