Topical Reports Under Review
Some links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS), and others are to documents
in Adobe Portable Document Format (PDF). ADAMS documents are provided in either
PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying
these formats, see our Plugins, Viewers, and
Other Tools page. If you have questions about search techniques or problems
with viewing or printing documents from ADAMS, please contact the Public
Document Room staff.
List of Reports Under Review as of April 28, 2008
On this page:
AREVA NP, INC. Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target Date |
Remarks (if applicable) |
MC9767 |
AREVA - BAW-10255 (P), Rev. 2, “Cycle-Specific DIVOM Methodology using the RAMONA5-FA Code” |
1/30/06 |
No AL issued before start of review. |
11/09/07
Revised 12/03/07* |
|
MC9766 |
AREVA - ANP-10262 (P), Rev. 0, “Enhanced Option III Long Term Stability Solution” |
1/31/06 |
No AL issued before start of review. |
11/9/07
Revised 12/3/07* |
|
*= actual draft SE issuance |
Boiling Water Reactor Owners' Group (BWROG) Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target Date |
Remarks (if applicable) |
MD1764 |
NEDO-33163, High Burnup BWR Fuel Rod Gap Release Fractions |
3/30/06 |
8/4/06 |
TBD -review on hold |
RAI response received 5/22/07. |
MD2693 |
NEDC-33178P, Rev. 0, GE Method for Development of Reactor Pressure Vessel P/T Curves |
7/28/06 |
11/9/06 |
4/30/08
Delayed - waiting on Supp. RAI response. |
RAI response received 11/15/07. |
MD2917 |
NEDO-33148, Rev. 2, Separation of LOOP from LBLOCA |
8/25/06 |
3/1/07 |
TBD after May 2008 meeting. |
RAI response received 9/28/07 |
MD5743 |
NEDE-33213P, ODYSY Application for Stability Licensing Calculations |
6/5/07 |
1/31/08 |
05/30/08 |
RAI response received 3/28/08. |
MD6697 |
NEDO-33349, Revision 1, BWR Application to RG 1.97, Revision 4 |
8/30/2007 |
3/26/08 |
4/30/09 |
|
MD8146 |
NEDC-33347P Revision 0, Containment Overpressure Credit for Net Positive Suction Head (NPSH) |
2/15/08 |
4/23/08 |
6/12/09 |
|
*= actual draft SE issuance |
Electric Power Research Institute (EPRI)/Nuclear Energy Institute (NEI) Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MC9663 |
NEI 94-01, Rev. 1, “Extension of ILRT Interval” |
12/19/05 |
5/10/06 |
12/05/07
Revised 4/30/08* |
RAI response submitted on 05/25/07 |
MD3236 |
EPRI TR-103237, Motor-Operated Valve Performance Prediction Methodology Software, Addenda 3, 4, 5, 6 and 7 |
1/6/06 |
11/14/06 |
3/14/08
A revised Target Date TBD |
1st round of RAIs (on the TR) issued 4/23/07.
1st round of RAI responses submitted on 9/27/07. |
MD4229 |
WCAP-16308-NP, 10 CFR 50.69 Pilot Program - Categorization Process – Wolf Creek Generating Station |
9/25/06 |
4/3/07 |
6/26/08 |
Fee waiver acceptance issued 12/26/06
RAIs issued on 8/27/07.
RAI responses provided on 10/22/07. |
MD5134 |
NEI WCAP-16294-NP, Rev. 0, “Risk-Informed Evaluation of Changes to Technical Specification Required Endstates For Westinghouse NSSS PWRs” |
9/9/05 |
|
3/28/08 |
Fee waiver acceptance issued 1/10/03 |
MD6111 |
NEI 04-10, Rev. 1, Risk-Informed Technical Specification Initiative 5B Risk-Informed Method for Control of Surveillance Frequencies |
4/19/07 |
|
4/14/08 |
Final SE issued on 9/19/07. |
MD8005 |
MRP-169, Technical Bases for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in PWRs |
1/9/08 |
3/25/08 |
8/22/08 |
RAI’s issued on 4/7/08 - ML080940280
RAI responses expected by 4/30/08 |
*= actual draft SE issuance |
GE Hitachi Nuclear Energy Americas LLC (GHNE)/Global Nuclear Fuel (GNF)
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MD2569 |
NEDE-32906P, Supp. 3, Migration to TRACG04/PANAC11 from TRACG02/PANAC10 for TRACG AOO and ATWS Overpressure Transients |
5/26/06 |
11/7/06 |
TBD once RAI responses received. |
RAI response delayed. Partial responses - received on 12/20/07.
Remaining responses expected 4/30/08. |
MD3119 |
NEDE-33284P, Rev. 0, Marathon 5S Control Rod Assembly |
9/27/06 |
6/13/07 |
TBD, staff evaluating RAI responses and revised LTR. |
LTR revision and RAI responses received 11/19/07. |
MD4114 |
NEDC-33256P, NEDC-33257P, and NEDC-33258P, The PRIME Model for Analysis of Fuel Rod Thermal-Mechanical Performance |
1/19/07 |
6/13/07 |
7/31/08 |
Draft Partial RAIs responses sent 4/1/08, remaining draft responses expected by 4/18/08. |
MD6241 |
NEDO-32950, Revision 1, “Compilation of Improvements to GENE’s SAFER ECCS-LOCA Evaluation Model” |
7/31/07 |
TBD |
TBD |
|
TBD |
GESTAR II Amendment 31, Stability Analysis and SRLR Template Update |
12/7/07 |
TBD |
TBD |
|
*= actual draft SE issuance |
HFC Controls Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MD7682 |
HFC-6000, Safety Control System |
|
|
|
|
*= actual draft SE issuance |
PWR Owners’ Group (formerly Westinghouse Owners’ Group - WOG) Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MC9768 |
WCAP-16168-NP, Rev. 1, “Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval” |
1/26/06 |
9/19/06 |
3/6/08* |
|
MD5891 |
WCAP-16793-NP, Rev. 0, Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in Recirculating Fluid |
6/4/07 |
9/7/07 |
3/7/08* |
|
MD6206 |
WCAP-15830-P, Revision 1, “Staggered Integrated Engineered Safety Features and Loss of Offsite Power Testing at CE NSSS Plants” |
7/31/07 |
11/15/07 |
5/31/08 |
|
MD7404 |
BAW-2374, Rev. 2, Risk Informed Assessment of OTSG loads due to breaks in RCS |
1/4/07 |
-- |
-- |
-- |
MD8138 |
WCAP-16125-NP, Revision 1, "Justification for Risk-Informed Modifications to Selected Technical Specifications for Conditions Leading to Exigent Plant Shutdown" |
1/7/08 |
TBD |
TBD |
|
*= actual draft SE issuance |
Sargent & Lundy Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MD6887 |
SL-TR-1, Rev 20, “Nuclear QA Program” |
9/21/07 |
TBD |
6/9/08 |
|
*= actual draft SE issuance |
Westinghouse Vendor Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MD2953 |
WCAP-16608, Westinghouse Containment Analysis Methodology |
8/29/06 |
1/4/07 |
6/13/08 |
|
MD3959 |
WCAP-16081, Addendum 1, SVEA-96 Optima2 CPR Correlation (D4) |
11/28/06 |
5/23/07 |
5/30/08 |
|
MD5258 |
WCAP-16747-P, Revision 0, POLCA-T: System Analysis Code with Three-Dimensional Core Model |
4/26/07 |
9/10/07 |
6/30/08 |
|
MD6380 |
WCAP-16608-P, Addendum 1, Revision 0, “Appendix C – PWR LOCA Mass and Energy Release Input Calculational Methodology |
7/31/07 |
10/26/07 |
6/6/08 |
Expect RAI response 4/25/08 |
MD6383 |
WCAP-16081-P, Addendum 2, Revision 0, “SVEA-96 OPTIMA2 CPR Correlation (D4): Modified R-factors for part-length rods |
7/31/07 |
11/15/2007 |
1/15/09 |
|
MD7230 |
WCAP-16766-P, “Westinghouse Next Generation Correlation (WNG-1) for Predicting Critical Heat Flux in Rod Bundles with Split Van Mixing Grids” |
10/26/07 |
1/24/08 |
1/15/09 |
RAIs sent by tech branch 4/17/8 |
MD7734 |
WCAP-16865, BWR ECCS Methodology |
12/20/07 |
9/30/08 |
3/31/09 |
|
MD7989 |
WCAP-16182, CR 99 Licensing Report |
11/2/08* |
2/15/08 |
1/16/09 |
AL in concurrence |
MD8540 |
WCAP-16498, 17x17 NGF Ref Core Report |
4/3/08 |
5/18/08 |
TBD |
|
*= actual draft SE issuance |
Boiling Water Reactor Vessel and Internals Project (BWRVIP) Reports
TaskID (TAC No.) |
Title |
Application Date |
Acceptance Letter Date (Some reports are
not applicable to this process) |
Draft Safety Evaluation Issuance Target
Date |
Remarks (if applicable) |
MA4468 |
BWRVIP-62, "Technical Basis for Inspection Relief for BWR Internal Components with Hydrogen Injection" |
3/7/00 |
N/A |
3/17/08 |
|
MB3948 |
BWRVIP-97, "Guidelines for Performing Weld Repairs to Irradiated BWR Internals" |
11/29/01
ML013340594 |
N/A |
8/31/08 |
|
MC2293 |
BWRVIP-03, Rev. 6, "BWR Vessel and Internals Project, Reactor Pressure Vessel and Internals Examination Guidelines" |
1/6/04 |
N/A |
5/30/08 |
|
MC7334 |
BWRVIP-139, “Steam Dryer Inspection and Flaw Evaluation Guidelines” |
5/10/05 |
6/30/05 |
6/15/07 changed to 5/23/08
revised to
7/11/08 |
|
MC7448 |
BWRVIP-06-A, “Consideration of Loose Parts” |
6/26/05 |
TBD |
5/30/08 changed to 7/11/08 |
|
MD3618 |
BWRVIP-158, Flaw Proximity Rules for Assessment of BWR Internals |
9/28/06 |
1/18/07 sent
2nd round 3/11/08 |
5/1/08 |
RAI dated 5/10/07 |
MD3762 |
BWRVIP Response to NRC SE of BWRVIP-84, Guidelines for Selection and Use of Materials for Repairs to BWR Internals |
12/5/06 |
N/A` |
8/30/08 |
|
MD4433 |
BWRVIP-76, BWR Core Shroud Inspection and Flaw Evaluation Guidelines for License Renewal Evaluation |
7/27/06 |
N/A |
8/30/08 |
|
MD6254 |
BWRVIP-59-A, Evaluation of Crack Growth in BWR Nickel Based Austenitic Alloys in RPV Internals |
6/21/07 |
N/A |
3/31/08 |
|
MD6255 |
BWRVIP-173, Evaluation of Chemistry Data for BWR Vessel Nozzle Forging Materials |
7/19/07 |
10/12/07 |
2/20/09 |
|
MD7957 |
BWRVIP-183, Top Guide Grid Beam Inspection and Flaw Evaluation Guidelines |
|
|
|
|
* = actual draft SE issuance |
Updated: April 28, 2008 |
|