skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
PWR Sump Performance
Overview
Function of the Containment Sump
Description of the Safety Issues
Discovery of the Sump Performance Issue
NRC Activities
Public Meetings
Resolution Schedule
Regulatory Activities
Related Information
Historical Timeline
Frequently Asked Questions
Reports and Correspondence
Regulations and Guidance
Technical References
Regulatory References
Bulletin 2003-01
Generic Letter 2004-02
Other Correspondence

Correspondence Related to NRC Generic Letter 2004-02

On September 13, 2004, NRC issued NRC Generic Letter 2004-02 PDF Icon, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactos." The generic letter required licensees to perform an evaluation of the potential for the adverse effects of post-accident debris blockage and operation with debris-laden fluids to impede or prevent the recirculation functions of the Emergency Core Cooling System (ECCS) and Containment Spray System (CSS).

In a letter dated November 14, 2006, the NRC acknowledged agreement with NEI that the due date for supplemental responses would be December 31, 2007. Subsequently, in a letter dated November 30, 2007, the NRC authorized licensees to provide these responses as late as February 29, 2008. The NRC staff plans to review the licensee’s GL responses to help verify adequacy of licensee’s evaluation and corrective actions intended to show compliance with regulatory staff positions concerning the availability of PWR sumps for long-term recirculation during a LOCA and to support eventual closure of GL 2004-02 and GSI-191. The staff will also consider the results of Temporary Instruction TI-2515/166, which will verify through inspection that licensees have completed corrective actions to which they have committed.

Once NRC staff concludes that plant has satisfactorily addressed Generic Letter 2004-02, and is either in compliance with applicable regulations or will be once specified remaining sections are complete, the NRC will issue a closure letter to the licensee for that plant documenting the NRC’s conclusions on the matter and closing the Generic Letter for that plant.

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

 