![]() |
Search Options | |||
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us | ![]() |
ACCESSION #: 9508290238 Information & Support Services P.O. Box 3707 Seattle, WA 98124 2207 BOEING August 22, 1995 G-1151-SJA-95-313 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 Reference: a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R. S. Orr to the NRC Operations Center b) NRC Letter Docket No. 99901227 dated August 12, 1992; L. J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21 Inquiry Dear Sir or Madam: In accordance with the reference correspondence and 10 CFR 21, Boeing is sending the NRC the attached error notice(s) received from our former software suppliers. Because of unknown current addresses, the following former customers were not notified: Reactor Controls, Inc. Echo Energy Consultants, Inc. Nuclear Applications and Systems Analysis Company (Japan) Nuclear Power Services Error notices have been sent to our other former customers. Very truly yours, Sandra J. Andrews Nuclear Administrator G-1151 M/S 7A-33 (206) 865-6248 Attachment(s): GTICES Program Response Form No. 95.15 Georgia Tech Computer Aided Structural Engineering Center Georgia Institute of Technology School of Civil & Environmental Engineering Atlanta, Georgia 30332 0355 USA 404 o 894 o 2260 404 o 894 o 8044 FAX August 17, 1995 Attention: Nuclear Administrator Boeing Information & Support Services P.O.Box 24346, M/S 7A-33 Seattle, Washington 98124-0346 RE: GT STRUDL Dear Sir or Madam: Enclosed please find a copy of GTICES PROGRAM REPORT FORM No. 95.15 and a VENDOR ACKNOWLEDGEMENT FORM. Please sign and return the VENDOR ACKNOWLEDGEMENT FORM to acknowledge receipt of the GTICES Program Report. Thank you for reviewing the Program Report and for returning the Acknowledgement Form. Best regards, CASE Center Catherine Lee Configuration Control Manager CL/jhb Enclosures GTSTRUDL Program Report Form GPRF No.: 95.15 DATE: August 17, 1995 FROM: Computer-Aided Structural Engineering Center Georgia Institute of Technology Atlanta, Georgia 30332-0355 SEVERITY LEVEL URGENT Problem results in incorrect answers which may not be apparent or job aborts and cannot be recovered within the session or job. SERIOUS Problem results in incorrect answers which are obvious or problem prevents completion of a particular user's task. x MINOR Problem can be worked around or problem poses high frustration factor. INFORMATIVE Documentation error, program usage tip, user Inconveniences. Date Problem Confirmed August 17, 1995 Date Notification Sent August 18, 1995 Computers PC Only Operating System DOS Version All versions including 92.01 Mod 0 and later Target Release for Correction 95.02 Manager, ASD Signature Title R & D Division Michael H. Swanger August 17, 1995 Typed or Printed Name Date of Signature Signature Title Professional Services Division Typed or Printed Name Date of Signature Rev. 2.2 GTSTRUDL Program Report Form (Continued) GPRF No.: 95.15 DATE: August 17, 1995 DESCRIPTION: Reinforced concrete P-[symbol omitted] analysis aborts if members having variable properties are present in the model. A workaround is to represent each segment in the variable-property members as an individual prismatic member. This will require additional joints and members. Applicable sections of the User's Manual: Section 2.1.9.2, Volume 1 The MEMBER PROPERTIES Command Section 8, Volume 4 Consideration of Column Slenderness Rev. 2.2 *** END OF DOCUMENT ***