skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
NRC Seal
NRC NEWS
U.S. NUCLEAR REGULATORY COMMISSION

Office of Public Affairs, Region IV
611 Ryan Plaza Drive, Suite 400, Arlington TX 76011
www.nrc.gov


No. IV-05-001   January 13, 2005
CONTACT: Victor Dricks
Phone: 817-860-8128
E-mail: opa4@nrc.gov

NRC STAFF TO MEET WITH STP NUCLEAR OPERATING CO.
TO DISCUSS ADOPTION OF NEW REGULATORY INITIATIVE
Printable Version PDF Icon


Nuclear Regulatory Commission staff will meet with representatives of the STP Nuclear Operating Co. on Tuesday, January 18, to discuss an NRC initiative that would provide greater flexibility in scheduling repairs without increasing the risk of a safety problem at the South Texas Project nuclear plant near Bay City, Tex.

The meeting, which will be open to public observation, will be held from 12 to 2 p.m. at NRC’s Region IV office at 611 Ryan Plaza Drive, Arlington, Tex. Before the session is adjourned, NRC staff will be available to answer questions from the public.

STP is participating in an NRC pilot program to test a risk-informed regulatory initiative. The proposed change to the plant’s technical specifications would permit the company to extend the time to repair systems, structures and components on the basis of their risk significance.



Privacy Policy | Site Disclaimer
Thursday, February 22, 2007