This procedure Memorandum revises mapping specifications outlined in Appendix K for the graphical presentation of the FIRMs to be derived from DFIRM information. Although FEMA is currently in the process of updating Appendix K of the Guidelines, changes to labeling and symbols associated with the format of FIRMs can be implemented immediately in an effort to simplify the production process and achieve cost savings.
|
|
Resource File: | View / Download / Print (pdf 147K) |
508 Accessible Format: | View / Download / Print (txt 19K) |
Download Plug-in
Some of the links on this page require a plug-in to view them. Links to the plug-ins are available below.