Risk Management Series Incremental Seismic Rehabilitation of Office Buildings Providing Protection to People and Buildings FEMA 397 December 2003 FEMA Appendix II. Integration Opportunities for Incremental Seismic Rehabilitation for Small Organizations and Individual Owners Small organizations or individual owners with limited professional facility management may use the following matrix to identify opportunities to integrate incremental seismic rehabilitation with maintenance and capital improvement projects. These opportunities can be identified on the basis of a quick evaluation by a design professional. The categories of maintenance and capital improvement projects included in the columns of this matrix are: 1. Roofing Maintenance & Repair/Re-Roofing 2. Exterior Wall and Window Maintenance/FaŤade Modernization 3. Public Area Modernization 4. Fire and Life Safety Improvements 5. New Technology Accommodation 6. Tenant Alterations and Improvements 7. Underfloor and Basement Work These categories are the same as those included in Section C.2, and are described in detail in the text portions of Sections C.2.1 through C.2.7, respectively. Two remaining categories of maintenance and capital improvement projects are not included in this matrix, but their respective integration opportunities can be identified by reference to several of the preceding seven, as follows: 1. HVAC Upgrade and Energy Conservation-integration opportunities from 1, 2, 3, and 6. 2. Hazardous Materials Abatement-integration opportunities from 3, 4, 5, and 6. Owners using this Appendix are encouraged to retain the services of a seismic engineer to identify additional incremental seismic improvements as discussed in Part C.