skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

NRC Seal NRC NEWS

U. S. NUCLEAR REGULATORY COMMISSION

OFFICE OF PUBLIC AFFAIRS, REGION I

475 Allendale Road, King of Prussia, Pa. 19406

CONTACT: Diane Screnci (610)337-5330/ e-mail: dps@nrc.gov
Neil A. Sheehan (610)337-5331/e-mail: nas@nrc.gov

I-97-5

January 23, 1997

Contact: Diane Screnci Neil A. Sheehan

NRC NAMES NEW RESIDENT INSPECTOR

AT INDIAN POINT UNIT 3

Nuclear Regulatory Commission officials in King of Prussia, Pennsylvania, have announced the assignment of Peter J. Habighorst as the agency's Resident Inspector at the Indian Point Unit 3 nuclear power plant, located in Buchanan, New York.

Mr. Habighorst joined the NRC as a reactor engineer in 1987. From 1988 through 1992 he was a resident inspector at the Millstone Station, Unit 2, in Waterford, Connecticut, and from 1992 through January of this year, he was a resident inspector at the Haddam Neck nuclear plant in Connecticut. Prior to joining the agency, Mr. Habighorst worked as a nuclear plant engineer for Westinghouse Electric Corporation. He received a Bachelor of Science in Systems Engineering from the U.S. Merchant Marine Academy, and is working toward a Masters degree in Environmental Engineering at the University of New Haven.

Mr. Habighorst joins NRC Senior Resident Inspector David Lew and Resident Inspector Timothy Frye at Indian Point 3. They can be reached at 914/739-8565.

#