Home > Nuclear Reactors > New Reactors > Combined License Applications > Grand Gulf, Unit 3 Application
Grand Gulf, Unit 3 Application
|
Who: |
Entergy Operations, Inc. (EOI) [see Part 1 for additional details]
|
What: |
Application for a combined license (COL) for an Economic Simplified Boiling Water Reactor (ESBWR) designated as Grand Gulf Unit 3
|
When: |
February 27, 2008 (date of application submittal)
|
Where: |
EOI's Grand Gulf site near Port Gibson in Claiborne County, Mississippi |
|
On this page:
The following links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS). ADAMS documents are provided
in either Adobe Portable Document Format (PDF) or Tagged Image File Format
(TIFF).
To obtain free viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools. If you have problems
with viewing or printing documents from ADAMS, please contact the Public
Document
Room staff.
Reference Documents
Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
Grand Gulf 3 COLA
- Part 1 – General and Administrative Information
- Part 2 – Final Safety Analysis Report (FSAR)
- Part 3 – Environmental Report
- Part 4 – Technical Specifications
- Part 5 – Emergency Plan
- Part 6 - LWA/Site Redness Plan
- Part 7 – Departures (Variances, Supplemental Information) from the ESBWR Design Control Document (DCD)
- Part 8 – Security Plan [This Part contains safeguards information which is withheld from public availability]
- Part 9 – Withheld information [This part contains sensitive information which is withheld from public availability]
- Part 10 – Tier 1/Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
- Part 11 – Enclosures [QA Plan, Environmental Protection Plan]
Application Review Schedule
Key Milestones |
Completion Date Actual - A Target - T |
Application Tendered |
02/27/08 - A |
Acceptance Review |
Acceptance Review Start |
03/03/08 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
04/17/08 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
05/16/08 - A |
Safety Review |
Phase 1 –Requests for Additional Information (RAIs) Issued to Applicant |
01/23/09 - T |
Phase 2 – SER with Open Items issued |
09/04/09 - T |
Phase 3 – ACRS Review of SER with Open Items Complete |
12/09 - T |
Phase 4 – Advanced SER with no Open Items Issued |
09/10 - T |
Phase 5 – ACRS Review of SER with no Open Items Complete |
01/11 - T |
Phase 6 – Final SER Issued |
03/11 - T |
Environmental Review |
Phase 1 – Environmental impact statement (EIS) summary report issued |
12/19/08 - T |
Phase 2 – Draft EIS issued to EPA |
05/19/09 - T |
Phase 3 – Response to public comments on draft EIS issued |
11/03/09 - T |
Phase 4 – Final EIS issued to EPA |
05/10 - T |
Hearing |
Commission or ASLB hold mandatory hearing |
|
License |
Commission decision on issuance of COL application |
|
Information on Federal Register Notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found at NRC’s Website on Hearing Opportunities.
NRC Documents
Requests for Additional Information
Category |
RAI Date |
RAI Letter No. and Subject |
Applicant Response |
Safety |
09/05/08 |
RAI Letter No. 01 SRP Section 19
|
|
09/12/08 |
RAI Letter No. 02 SRP Section 2.31, 2.3.4 and 2.3.5
|
|
09/12/08 |
RAI Letter No. 03 SRP Section 12.03-12.04
|
|
09/16/08 |
RAI Letter No. 04 SRP Section 13.01.02-13.01.03
|
|
09/18/08 |
RAI Letter No. 05 SRP Section 17.5
|
|
09/18/08 |
RAI Letter No. 06 SRP Section 10.04.05
|
|
Environmental |
09/08/08 |
Request for Additional Information Regarding the Environmental Review of the Combined License Application for Grand Gulf Nuclear Station, Unit 3
|
|
Public Meetings
Date |
Description |
06/19/08 |
Public Scoping Meeting
|
03/19/08 |
Meeting regarding the technical content of the Grand Gulf Unit 3 COLA
|
03/06/08 |
Grand Gulf Unit 3 COLA Orientation
|
02/21/08 |
Public Outreach Meeting
|
Contacts
Contacts for the Grand Gulf COL Application |
Safety Project Manager |
Eric Oesterle Mark Tonacci |
Environmental Project Manager |
Tamsen Dozier |
Contact a Public Affairs Officer |
|