Safety Evaluation Report Related to the License Renewal of Pilgrim Nuclear Power Station (NUREG-1891)

On this page:

Download complete document

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.


Publication Information

Manuscript Completed: September 2007
Date Published: November 2007

Division of License Renewal
Office of Nuclear Reactor Regulation
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice


Abstract

This safety evaluation report (SER) documents the technical review of the Pilgrim Nuclear
Power Station (PNPS) license renewal application (LRA) by the United States (US) Nuclear
Regulatory Commission (NRC) staff (the staff). By letter dated January 25, 2006, Entergy
Nuclear Operations, Inc. (ENO or the applicant), submitted the LRA in accordance with Title 10,
Part 54, of the Code of Federal Regulations, “Requirements for Renewal of Operating Licenses
for Nuclear Power Plants.” ENO requests renewal of the PNPS operating license (Facility
Operating License Number DPR-35) for a period of 20 years beyond the current expiration at
midnight June 8, 2012.

PNPS is located approximately 4 miles southeast of Plymouth, Massachusetts. The NRC
issued the PNPS construction permit on August 26, 1968, and operating license on
September 15, 1972. PNPS is a Mark 1 boiling water reactor design. General Electric supplied
the nuclear steam supply system and Bechtel Corporation originally designed and constructed
the balance of plants. The PNPS licensed power output is 2028 megawatt thermal with a gross
electrical output of approximately 690 megawatt electric.

This SER presents the status of the staff’s review of information submitted through September
12, 2007, the cutoff date for consideration in the SER. The staff identified open items that were
resolved before the staff made a final determination on the application. SER Section 1.5
summarizes these items and their resolution. Section 6.0 provides the staff’s final conclusion on
the review of the PNPS LRA.