skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Interim Staff Guidance Used by the Division of Fuel Cycle Safety and Safeguards (FCSS) Staff

FCSS-ISG-01 Methods for Qualitative Evaluation of Likelihood
FCSS-ISG-03 Nuclear Criticality Safety Performance Requirements and Double Contingency Principle
FCSS-ISG-04 Baseline Design Criteria
FCSS-ISG-05 Reporting Requirements
FCSS-ISG-06 Canceled as no longer needed
FCSS-ISG-07 Canceled as no longer needed
FCSS-ISG-08 Natural Phenomena Hazards
FCSS-ISG-09 Initial Event Frequencies
FCSS-ISG-10
Justification for Minimum Margin of Subcriticality for Safety

Draft FCSS Interim Staff Guidance

Document Number Title Date Published in Federal Register Comment Deadline
FCSS-ISG-02 Accident Sequences That Result in Consequences (in revision to add clarification to AEGL tables, etc.) 09/23/2004 10/25/2004

Draft FCSS Interim Staff Guidance for Comment

Document Number Title Date Published in Federal Register Comment Deadline
None
None
None
None



Privacy Policy | Site Disclaimer
Monday, February 19, 2007