skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
NRC Seal
NRC NEWS
U.S. NUCLEAR REGULATORY COMMISSION
Office of Public Affairs Telephone: 301/415-8200
Washington, DC 20555-0001 E-mail: opa@nrc.gov
www.nrc.gov

No. 08-123 July 1, 2008

NRC APPROVES POWER UPRATE FOR
DAVIS-BESSE NUCLEAR POWER PLANT
Printable Version PDF Icon


The Nuclear Regulatory Commission on June 30 approved a request by FirstEnergy Nuclear Operating Company to increase the generating capacity of the Davis-Besse nuclear power plant by approximately 1.6 percent. The reactor is located about 21 miles east-southeast of Toledo, Ohio.

The NRC staff determined that FirstEnergy could safely increase the reactor’s output primarily through more accurate means of measuring feedwater flow. NRC staff also reviewed FirstEnergy’s evaluations showing the plant’s design can handle the increased power level.

The NRC's safety evaluation of the plant’s proposed power uprate focused on several areas, such as the nuclear steam supply systems, instrumentation and control systems, electrical systems, accident evaluations, radiological consequences, operations and training, testing, and technical specification changes.

The power uprate will increase Davis-Besse’s generating capacity from approximately 893 to 905 megawatts electric. FirstEnergy intends to implement the uprate this summer.

The NRC previously published a notice about the power uprate application in the Federal Register providing the public an opportunity to comment or request a hearing. No requests were submitted. The agency’s evaluation of the Davis-Besse uprate is available through the NRC’s ADAMS electronic document database by entering ML081410652 on this Web page: http://adamswebsearch.nrc.gov/dologin.htm.

NRC news releases are available through a free listserv subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html. The NRC Home Page at www.nrc.gov also offers a Subscribe to News link in the News & Information menu. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web Site.



Privacy Policy | Site Disclaimer
Tuesday, July 01, 2008